Engineering · Service contract
Supervision of photovoltaic and energy storage installation for Sulmierzyce Municipality
Supervision of the supply and installation of photovoltaic panels with a total capacity of 690.6 kWp and energy storage systems with a total capacity of 978 kWh for 176 households and one public utility building in Sulmierzyce Municipality.
- Deadline
- Closed 13 days ago
- Location
- Sulmierzyce, Wielkopolskie, Poland
About the project
Supervision of the supply and installation of photovoltaic panels with a total capacity of 690.6 kWp and energy storage systems with a total capacity of 978 kWh for 176 households and one public utility building in Sulmierzyce Municipality. The supervision covers electrical, structural, and sanitary disciplines under a 'design and build' formula.
Scope of work
Supervision of the supply and installation of photovoltaic panels (690.6 kWp total) and energy storage systems (978 kWh total) for 176 households and one public utility building. The supervision covers electrical, structural, and sanitary disciplines, including oversight of the 'design and build' process for the installations.
Deliverables
- Supervision of photovoltaic installation supply and assembly
- Supervision of energy storage system supply and assembly
- Technical and construction supervision documentation
Required services
- Construction supervision (electrical, structural, and sanitary disciplines)
- Technical supervision of photovoltaic and energy storage installations
- Project and documentation supervision
Pelenoir assessment
The project involves the supervision of photovoltaic and energy storage installations for residential and public utility buildings, with a primary focus on technical and construction supervision across electrical, structural, and sanitary disciplines. This aligns with engineering and technical planning, while project and construction management is also supported for overseeing the 'design and build' process and documentation.
-
Engineering 70%
Technical and construction supervision of electrical, structural, and sanitary disciplines for the photovoltaic and energy storage installations, including oversight of the 'design and build' process.
-
Project management and client representation for the supervision of the installation process, including coordination of the 'design and build' formula and documentation oversight.
How to take part
Who can apply
- At least one person with construction supervision qualifications in electrical installations (Group 1) and 5 years of professional experience
- At least one person with construction supervision qualifications in structural disciplines
- Experience in supervising at least 30 photovoltaic installations and 10 energy storage systems in the last 5 years
- Compliance with Polish construction law and EU qualification recognition regulations
What to submit
- Completed offer form (zał nr 1 do SWZ)
- Statement of non-exclusion (zał nr 4 do SWZ)
- List of services (zał nr 5 do SWZ)
- List of personnel (zał nr 6 do SWZ)
- Statement of current information (zał nr 7 do SWZ)
- Statement regarding capital group (zał nr 8 do SWZ)
- Commitment of resource-sharing entity (zał nr 3 do SWZ, if applicable)
- Joint bidder statement (zał nr 1a do SWZ, if applicable)
Award criteria
- Price (60% weight)
- Experience of the supervision inspector (40% weight)
Tender documents
The visible document package includes 12 files, primarily consisting of submission forms, declarations, and technical specifications. The files named 'SWZ.pdf' and 'zał nr 2 do SWZ - SZCZEGÓŁOWY OPIS PRZEDMIOTU ZAMÓWIENIA.pdf' likely contain the detailed terms of reference and technical requirements for the supervision services. The DOCX files appear to be templates for offer forms, statements of non-exclusion, and personnel lists required for submission. The 'zał nr 9 do SWZ- Wzór umowy.pdf' is probably the draft contract for the supervision services. The exact content of the technical specifications and contract terms remains unknown without accessing the files.
Source
Published on e-Zamowienia. Original title: Nadzór inwestorski nad zadaniem obejmującym dostawę i montaż instalacji fotowoltaicznych oraz magazynów energii dla mieszkańców oraz budynku użyteczności publicznej dla Gminy Miejskiej Sulmierzyce.
Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.