About the project

Expansion of the railway line between Stockerau and Retz with a focus on vibration and secondary noise impact assessment and mitigation as part of an environmental impact assessment (UVP) submission project.

Scope of work

Preparation of vibration and secondary noise impact assessment (Wirkfaktorbericht) as part of an environmental impact assessment (UVP-G) submission for the selective double-track expansion of the Stockerau–Retz railway line. Optional follow-up support during the detail planning phase.

Deliverables

  • Wirkfaktorbericht Erschütterungen und Sekundärschall (vibration and secondary noise impact report)
  • Environmental impact assessment (UVP-G) submission documents

Required services

  • vibration and secondary noise assessment
  • environmental impact assessment support
  • detail planning support (optional)

Pelenoir assessment

This project is primarily focused on engineering and technical planning for vibration and secondary noise impact assessment as part of a railway infrastructure expansion. It also includes a secondary component of sustainability and building performance related to environmental impact assessment and compliance.

  • Technical engineering for vibration and secondary noise impact assessment, including modeling, analysis, and mitigation measures for the railway expansion project.

  • Environmental impact assessment (UVP-G) and mitigation of vibration and noise effects to ensure compliance with sustainability and environmental performance standards.

How to take part

Who can apply

  • Professional qualifications in architecture, engineering, or related planning services (CPV 71240000)
  • No specific legal form required for the bidding consortium
  • No reserved participation

What to submit

  • Offers must be submitted in German
  • Electronic submission required via www.provia.at
  • No electronic catalogue or variants permitted

Award criteria

  • Technically and economically most advantageous offer

Tender documents

The visible document package includes PDF files likely containing tender documents, technical specifications, and environmental impact assessment requirements (e.g., 'AMV005_Ausschr ES_Teil1_Ber1.pdf', 'AMV005_Ausschr_ErschSekschall_Teil3.pdf'). ZIP archives ('Beilage_A (3).zip', 'Beilage_B (4).zip') probably contain supplementary plans, drawings, or datasets related to vibration and noise assessment. Excel files ('AMV005_Vergabe_ES_Beilage 4.1.xlsx', 'AMV005_Vergabe_ES_Beilage 4.2.xlsx') may include submission forms or structured data templates. The exact contents of the ZIP files cannot be confirmed without access, but their names suggest they support the environmental and technical scope of the project.

Source

Published on Austrian Public Procurement Search. Original title: AMV005 Stockerau - Retz; selektiv 2-gleisiger Ausbau - Erschütterungen und Sekundärschall.

Summary and assessment prepared by Pelenoir from the public notice (29 Oct 2026). The original notice and its documents are binding. Page updated 28 Oct 2026.