Engineering · Service contract
Stockerau - Retz selective double-track expansion
Environmental impact assessment (EIA) services for the selective double-track expansion of the railway line between Stockerau and Retz, including impact reports on noise, air pollutants, light, and climate-energy concepts as part of the submission project…
- Deadline
- Closed 52 days ago
- Location
- Austria
About the project
Environmental impact assessment (EIA) services for the selective double-track expansion of the railway line between Stockerau and Retz, including impact reports on noise, air pollutants, light, and climate-energy concepts as part of the submission project under the Austrian Environmental Impact Assessment Act (UVP-G). Optional services include the setup, operation, and evaluation of a climate and air quality monitoring station, as well as support during the detailed planning phase.
Scope of work
Preparation of environmental impact assessment (EIA) reports for noise, air pollutants, light, and climate-energy concepts as part of the submission project for the selective double-track expansion of the railway line between Stockerau and Retz. Optional services include the establishment and operation of a climate and air quality monitoring station, as well as support during the detailed planning phase.
Deliverables
- Impact report on noise (Wirkfaktorbericht Lärm)
- Impact report on light/glare/shading (Wirkfaktorbericht Licht/Blendung/Beschattung)
- Impact report on air pollutants (Wirkfaktorbericht Luftschadstoffe)
- Subject-specific specialist contributions on air and climate (Fachbeiträge Luft und Klima)
- Climate-energy concept (Klima-Energiekonzept)
Required services
- Environmental impact assessment (EIA) services
- Technical planning services for railway infrastructure
- Climate and air quality monitoring (optional)
- Support during detailed planning phase (optional)
Pelenoir assessment
The project scope is primarily focused on engineering and technical planning for the selective double-track expansion of a railway line, with a significant secondary emphasis on sustainability and environmental performance assessments. The deliverables include impact reports and climate-energy concepts, which require expertise in both engineering and sustainability disciplines.
-
Engineering 70%
Technical planning and engineering services for the railway infrastructure expansion, including structural, civil, and environmental engineering aspects such as noise, air pollutants, and light impact assessments.
-
Sustainability 30%
Development of climate-energy concepts, air and climate specialist contributions, and optional climate and air quality monitoring services to ensure sustainability and environmental performance of the railway infrastructure.
How to take part
Who can apply
- No restrictive participation conditions stated
- Consortia limited to a maximum of 2 members
What to submit
- Electronic submission via the Bieterportal (the original notice
- Two-envelope system (2-Kuvertsystem) for offers
- Submission of required documents in PDF, DOCX, or XLS format
Award criteria
- Technically and economically most advantageous offer
Tender documents
The visible document package includes participation forms and contract documents (e.g., 'AMV005_Ausschr-WF exkl ES EMF__1A-Teilnahmea.docx' and '.pdf'), project briefs and task descriptions (e.g., 'AMV005_Ausschr WF exkl ES EMF_2_Projektb.pdf' and '_3_Aufgabenb.pdf'), and submission guidelines (e.g., 'Anleitung_Abgabe des Angebotes im 2-Kuvertsystem_22062026.pdf'). Two ZIP archives ('Beilage_A (3).zip' and 'Beilage_B (4).zip') likely contain supplementary materials such as plans, drawings, or datasets, but their exact contents cannot be confirmed without access. The package appears to support the preparation and submission of offers for the environmental impact assessment services. Uncertainty remains about the full scope of files due to login restrictions.
Source
Published on Austrian Public Procurement Search. Original title: AMV005 Stockerau - Retz; selektiv 2-gleisiger Ausbau - UVE-Wirkfaktorb. Lärm, Luft, Licht, UVE-FB Luft/Klima, UVE-FB Klima-Energiekonzept.
Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 21 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.