Tenders of Europe project card: Sports and community centre: 4,000 m² new build with design-build delivery, Capelle aan den IJssel, Netherlands
Featured in the daily edition, 13 Nov 2026

About the project

Replacement of the existing Schenkel sports hall in Capelle aan den IJssel with a new 4,000 m² sports and community centre. The project includes demolition of the old hall, site preparation, design and construction of the new facility, outdoor space adjustments, and a 12-month maintenance period with energy monitoring.

Why it matters

A 4,000 m² sports and community centre in Capelle aan den IJssel turns demolition and site prep into the first quiet rules of daily use.

Scope of work

Integrated design and build contract for a new 4,000 m² sports and community centre, including demolition of the existing sports hall, site preparation, design, construction, outdoor space adjustments, and a 12-month maintenance period with energy monitoring. The contract follows UAV-GC 2025 standards.

Deliverables

  • Design and construction of a 4,000 m² sports and community centre
  • Demolition of the existing Schenkel sports hall
  • Site preparation and outdoor space adjustments
  • 12-month maintenance period including energy monitoring

Required services

Pelenoir assessment

The project is a design-build contract for a new 4,000 m² sports and community centre, combining architectural design, engineering, and construction under a single integrated delivery model. The primary focus is on architectural and spatial design, supported by technical engineering and physical construction activities.

  • Architectural design of the new 4,000 m² sports and community centre, including conceptual and spatial development, building form, and integration with the surrounding environment.

  • Structural, civil, and building-services engineering for the new sports and community centre, including technical systems, infrastructure, and compliance with UAV-GC 2025 standards.

  • Physical construction of the new sports and community centre, including demolition of the existing hall, site preparation, and execution of the design-build contract under UAV-GC 2025 standards.

How to take part

Who can apply

  • Uniform European Tender Document (UEA) required
  • Minimum of 5 bidders to be invited for the second phase
  • No reserved participation

What to submit

  • Electronic submission required
  • Documents in Dutch
  • No variants allowed

Award criteria

  • Architectural, urban and spatial quality (30%)
  • Design & functionality (40%)
  • Energy consumption & maintenance (10%)
  • Sustainability & quality (20%)

Tender documents

The visible document package includes the official tender notice in PDF format, a selection guide for bidders ('Selectieleidraad Sport- en beweegcentrum Schenkel'), and several compliance-related forms as DOCX files. These forms cover declarations on Russian involvement, goods origin, references, and a bank guarantee model. A PDF on social return valuation options is also included. The ZIP file likely bundles all these documents for download. The exact content of the selection guide and compliance forms is not visible, but they likely detail eligibility, submission procedures, and contractual obligations.

Source

Published on TenderNed. Original title: Design & Build Sport- en beweegcentrum Schenkel.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.