Architecture · Design and build
Multifunctional community centre: renovation and extension of Huis de Misse in Heesch
A bouwteam model for a community centre: where renovation and extension turn adaptability into daily use.
- Deadline
- 38 days left to apply
- Location
- Heesch, Netherlands
- Declared value
- EUR 13.1 m
About the project
Renovation and extension of an existing community centre (Huis de Misse) in Heesch to create an integrated, multifunctional and welcoming facility for cultural, educational and social activities. The project includes a construction team (bouwteam) approach starting from the definitive design phase, leading to a technical design and ultimately the realisation of the building. The contractor will provide both construction and installation services during the design and execution phases.
Why it matters
A bouwteam model for a community centre turns renovation and extension into the quiet backbone of adaptability and daily use.
Scope of work
The contractor is required to participate in a construction team (bouwteam) starting from the definitive design phase, contributing construction and installation expertise to the design process. The contractor will then realise the technical design and execute the construction of the renovated and extended Huis de Misse. The scope includes both building and installation work, with the possibility to engage subcontractors for installation services. The project must comply with social return requirements (1% of contract value).
Deliverables
- Definitive design (DO) with cost estimate
- Technical design (TO)
- Execution-ready design (UO)
- Completed renovation and extension of Huis de Misse
Required services
- Construction services
- Installation services (building systems)
- Construction team collaboration and design input
- Project management and coordination during design and execution phases
Pelenoir assessment
The project primarily involves architectural design for the renovation and extension of a multifunctional community centre, supported by engineering and technical planning for building systems and structural work. The contractor's role in the construction team (bouwteam) and execution phases also places significant scope weight on construction and general contracting. The focus is on delivering an integrated facility through collaborative design and build processes.
-
Architecture 40%
Architectural design for the renovation and extension of Huis de Misse, including spatial integration of cultural, educational, and social functions within the definitive design (DO) and technical design (TO) phases.
-
Engineering 30%
Structural, civil, and building-services engineering for the renovation and extension, including technical coordination of installation services and compliance with construction standards.
-
Physical construction, installation, and execution of the renovation and extension of Huis de Misse, including subcontractor management for installation services and compliance with social return requirements.
How to take part
Who can apply
- Contractors must meet selection criteria outlined in the tender documents
- Minimum of 5 bidders will be invited to the second phase
- Participation is open to small and medium-sized enterprises (SMEs)
- Contractors must comply with social return requirements (1% of contract value)
What to submit
- Plan of approach for the construction team phase
- Plan of approach for the realisation phase
- Description of the proposed construction team composition
- Details of cost management approach during the construction team phase
- Financial guarantee (5% of the contract value for execution, in the form of a bank guarantee)
Award criteria
- Price (40%): Mark-up percentages on direct costs (general costs, site costs, profit and risk margin)
- Quality (60%): Plan of approach for the construction team phase (20%), plan of approach for the realisation phase (20%), composition of the construction team (10%), cost management during the construction team phase (10%)
Tender documents
The visible document package includes a single PDF file labelled 'Original notice.pdf'. Based on the tender context, this file likely contains the full tender notice, including detailed contractual conditions, the spatial, functional and technical programme of requirements (PvE) for the renovation and extension, and selection guidelines for bidders. It may also include appendices referenced in the tender, such as the social return requirements and the selection criteria. The exact contents of drawings or technical plans are not visible, but the PvE documents are explicitly mentioned as part of the tender package.
Source
Published on TenderNed. Original title: Aannemer Bouwteam Huis de Misse Bernheze.
Summary and assessment prepared by Pelenoir from the public notice (20 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.




