About the project

Design of complete project documentation for a new warehouse building to support civil defense and population protection in Sopot, Poland. The facility will be constructed on plot 10/3, ark. 42, at Bitwy pod Płowcami Street, within the existing Water Treatment Plant site.

Scope of work

Complete multi-discipline design documentation for a new civil defense and population protection warehouse building, including architectural, structural, and engineering design services. The project is part of the Civil Defense and Population Protection Program 2025-2026.

Deliverables

  • complete project documentation for warehouse construction

Required services

Pelenoir assessment

The project scope explicitly covers both architectural design and engineering services for a civil defense warehouse, requiring complete multi-discipline design documentation. The architectural and engineering disciplines are equally emphasized in the tender requirements, with no evidence supporting other AEC business groups.

  • Architectural concept and building design for the civil defense and population protection warehouse, including spatial organization, functional layout, and compliance with public infrastructure standards.

  • Structural, civil, and building-services engineering for the warehouse, including load-bearing systems, infrastructure integration, and technical compliance with civil defense requirements.

How to take part

Who can apply

  • Contractor must demonstrate experience in designing at least one multi-discipline building with a volume of at least 5,500 m³ in the last three years
  • Contractor must employ at least one designer with unlimited structural design qualifications and experience in designing a building with a volume of at least 5,000 m³
  • Contractor must be registered in the relevant professional chamber (Polish Chamber of Architects or equivalent EU recognition)

What to submit

  • Offer in Polish, in electronic form with qualified electronic signature, trusted signature, or personal signature
  • Statement on exclusion grounds (art. 125(1) of the Polish Public Procurement Law)
  • Document confirming the contractor's legal representation (e.g., KRS, CEiDG extract, or power of attorney)
  • Statement on reliance on third-party resources (if applicable)

Award criteria

  • Cost (60% weight)
  • Guarantee (40% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla budowy magazynu na potrzeby ochrony ludności i obrony cywilnej.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 2 Oct 2026.