About the project

Update of the 2019 design documentation for a reinforced-concrete memorial to the victims of the 1945 deportation of Upper Silesia residents to the Soviet Union, including architectural, structural, site development, finishing, utility and lighting solutions, drainage, and protection of existing underground utilities. The contract also includes an optional author's supervision during construction if requested by the client.

Scope of work

Update of the 2019 design documentation for a memorial monument, including architectural, structural, site development, finishing, utilities, lighting, drainage, and protection of existing underground utilities. The contract includes an optional author's supervision during construction if requested by the client within three years of contract signing.

Deliverables

  • Updated design documentation for all disciplines (architectural, structural, site development, finishing, utilities, lighting, drainage)
  • Obtaining a building permit
  • Optional author's supervision during construction (if requested by the client)

Required services

Pelenoir assessment

This project primarily involves the architectural design of a reinforced-concrete memorial monument, supported by structural and technical engineering, as well as site development and landscaping. The scope covers the update of design documentation across these disciplines, with an optional author's supervision component during construction.

  • Architectural design and conceptual development of the reinforced-concrete memorial, including form, aesthetics, and integration with the surrounding site context.

  • Structural engineering for the reinforced-concrete monument, utility and lighting design, drainage solutions, and protection of existing underground utilities.

  • Site development and landscaping around the memorial, including integration of the monument with its outdoor environment and public realm.

How to take part

Who can apply

  • Execution of at least one design documentation for a reinforced-concrete structure of at least 8 metres in height, including obtaining a construction permit, within the last 5 years
  • Availability of at least one person with unlimited architectural design qualifications and valid membership in the Regional Chamber of Civil Engineers
  • Availability of at least one person with unlimited structural engineering qualifications and valid membership in the Regional Chamber of Civil Engineers
  • Consortium members may combine qualifications and experience

What to submit

  • Offer in electronic form via the e-Zamawiający platform
  • Statement on exclusion grounds and compliance with participation conditions (Załącznik nr 2 do SWZ)
  • For consortia: statement on the division of services among members (Załącznik nr 4 do SWZ)
  • For reliance on third-party resources: commitment from the third party (Załącznik nr 3 do SWZ)
  • List of services executed in the last 5 years (Załącznik nr 6 do SWZ)
  • List of personnel assigned to the project with their qualifications (Załącznik nr 6A do SWZ)

Award criteria

  • Price (60% weight)
  • Experience of the person designated to execute the contract (40% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie aktualizacji dok. projektowej oraz usług objętych prawem opcji ramach zad. inwest. „Wzniesienie pomnika Ofiar Deportacji Mieszkańców Górnego Śląska do Związku Sowieckiego w 1945 roku”..

Summary and assessment prepared by Pelenoir from the public notice (21 Nov 2026). The original notice and its documents are binding. Page updated 20 Nov 2026.