About the project

Implementation of energy-saving measures and energy generation solutions for electricity, heating, and cooling systems at the Seefeld Sport and Congress Centre through an energy savings contracting model. The project includes efficiency improvements in building technology, plant engineering, user motivation, and CO₂ reduction as part of an ideas competition.

Scope of work

Proposals for energy-saving measures and energy generation solutions tailored to the property, including implementation of complete efficiency measures across all required trades and ancillary work. The project covers building technology, plant engineering, user motivation, and CO₂ reduction as part of an ideas competition.

Deliverables

  • Energy-saving measures for electricity, heating, and cooling systems
  • Energy generation solutions for all media (electricity, heating, cooling)
  • Implementation of complete efficiency measures including all required trades and ancillary work

Required services

  • energy efficiency consulting
  • building technology optimization
  • plant engineering
  • CO₂ reduction measures
  • user motivation strategies

Pelenoir assessment

This project is primarily focused on sustainability and building performance, with a strong emphasis on energy efficiency upgrades and CO₂ reduction for an existing sports and congress centre. Technical engineering support is also required to optimize building and plant systems, making it a multidisciplinary effort centered on sustainable infrastructure.

  • Development and implementation of energy-saving measures, energy generation solutions, and CO₂ reduction strategies for the Sport and Congress Centre's electricity, heating, and cooling systems. This includes optimizing building performance through efficiency improvements in building technology and plant engineering.

  • Technical planning and optimization of building technology and plant engineering systems to support energy efficiency upgrades, including the implementation of measures across all required trades and ancillary work.

Tender documents

The visible document package includes two web links labeled 'Gewerkeübersicht' (trade overview) and 'AGB' (general terms and conditions). These likely provide information on the required trades for the energy efficiency project and the contractual terms governing the procurement process. No specific files, drawings, or technical documents are directly accessible without login. The exact content of any plans, technical specifications, or detailed project requirements remains unknown due to the login requirement.

Source

Published on Austrian Public Procurement Search. Original title: Sport- und Kongresszentrum Seefeld Tirol GmbH.

Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 13 Sep 2026.