Engineering · Design and build
Rybnik mini speedway sound-absorbing barrier construction
Design and construction of a 5-meter-high sound-absorbing barrier (acoustic screens) along the boundary of a mini speedway track, including a 6-meter-wide entrance gate, using a design-and-build procurement method.
- Deadline
- Closed 44 days ago
- Location
- Rybnik, Silesian, Poland
About the project
Design and construction of a 5-meter-high sound-absorbing barrier (acoustic screens) along the boundary of a mini speedway track, including a 6-meter-wide entrance gate, using a design-and-build procurement method.
Scope of work
Design and construction of a 5-meter-high sound-absorbing barrier with acoustic class A2 absorption and B3 insulation, including a 6-meter-wide entrance gate, along the boundary of a mini speedway track in Rybnik. The project follows a design-and-build procurement method.
Deliverables
- sound-absorbing barrier (acoustic screens) with a minimum height of 5 meters
- entrance gate with a clear width of 6 meters and height matching the barrier
- design documentation for the barrier and gate
- construction and installation of the barrier and gate
Required services
- engineering design services
- construction and installation of protective devices
Pelenoir assessment
This project primarily involves the engineering design and technical planning of a sound-absorbing barrier with specific acoustic performance requirements, supported by construction and installation under a design-and-build contract. The scope does not explicitly support architectural design, urban planning, or other AEC disciplines beyond engineering and construction.
-
Engineering 60%
Design and technical planning of a 5-meter-high sound-absorbing barrier with specified acoustic performance (class A2 absorption and B3 insulation), including structural integrity, material selection, and compliance with engineering standards for noise mitigation.
-
Construction and installation of the sound-absorbing barrier and entrance gate, including site preparation, material procurement, and physical assembly of the barrier system.
How to take part
Who can apply
- compliance with Polish public procurement law (art. 125 ust. 1 ustawy)
- submission of required declarations and documents as specified in the tender
What to submit
- completed offer form (Załącznik nr 1)
- declaration of non-exclusion and compliance with participation conditions (Załącznik nr 2)
- documents confirming the legal status and representation of the bidder
- power of attorney if applicable
Award criteria
- Price (60% weight)
- Completion deadline (20% weight)
- Warranty period (20% weight)
Tender documents
The visible document package includes a specification of contract conditions (Specyfikacja warunków zamówienia.docx), which likely contains detailed procurement rules, technical requirements, and contractual terms. The technical documentation is provided as a ZIP archive (dokumentacja techniczna.zip), which may include drawings, site plans, or acoustic studies related to the sound-absorbing barrier. Three additional documents are submission forms and declarations: an offer form (Załącznik nr 1), a declaration of non-exclusion (Załącznik nr 2), and draft contract provisions (Załącznik nr 3). The exact contents of the ZIP archive cannot be confirmed without access, but the filenames suggest it contains design or construction plans.
Source
Published on e-Zamowienia. Original title: Zabudowa ekranu dźwiękochłonnego w granicy toru mini żużlowego znajdującego się na terenie działek nr 2061/96, 2681/96 przy ul. Jana Kowalczyka w Rybniku w systemie zaprojektuj i wybuduj.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.