Engineering · Service contract
Road infrastructure design for Białystok streets expansion
Preparation of design documentation for the expansion of Bitwy Białostockiej Street, a service road along Gen.
- Deadline
- Closed 10 days ago
- Location
- Białystok, Podlaskie, Poland
About the project
Preparation of design documentation for the expansion of Bitwy Białostockiej Street, a service road along Gen. Wł. Andersa Street (1KDD), and a road to the incineration plant (4KD-L, 2KD-L) in Białystok. The project includes road redesign, pedestrian and cycling paths, utility infrastructure, and traffic studies for intersection variants.
Scope of work
Design documentation for the expansion of three road sections in Białystok, including traffic studies, intersection redesign (two variants), pedestrian and cycling paths, utility infrastructure, and coordination with municipal authorities for project naming and approvals.
Deliverables
- Design documentation for Bitwy Białostockiej Street expansion (including intersection redesign with two variants: roundabout and traffic signals)
- Design documentation for service road along Gen. Wł. Andersa Street (1KDD)
- Design documentation for road to incineration plant (4KD-L, 2KD-L)
- Traffic volume studies and forecasts (WR-D-13 guidelines)
- Utility infrastructure redesign (lighting, technological channels, colliding infrastructure)
- Coordination with Białystok Architecture Department for project naming and approvals
Required services
- Engineering design services
- Traffic studies and forecasting
- Urban infrastructure planning
- Utility infrastructure design
Pelenoir assessment
This project primarily involves engineering and technical planning for road infrastructure and utility systems, with a secondary focus on urban design elements such as pedestrian/cycling paths and intersection planning. The scope is grounded in the tender's emphasis on design documentation for road expansions, traffic studies, and utility infrastructure, alongside urban coordination requirements.
-
Engineering 70%
Design of road expansions, utility infrastructure (lighting, technological channels), and technical coordination for traffic studies and intersection redesign variants.
-
Planning of pedestrian and cycling paths, intersection redesign variants (roundabout vs. traffic signals), and coordination with municipal authorities for urban approvals.
How to take part
Who can apply
- Minimum 2 design documentations for road construction/redesign with utility infrastructure (value ≥ 250,000 PLN gross each) in the last 3 years
- Project manager with road engineering qualifications and experience in at least 2 similar projects
- Compliance with Polish Public Procurement Law (Pzp) requirements
What to submit
- Offers submitted electronically via the procurement platform the original notice
- Documents in Polish language
- List of completed services (attachment 3 to SWZ)
- List of personnel with qualifications and experience (attachment 4 to SWZ)
- Statutory declarations (attachment 2 to SWZ)
- Potential consortium agreements and resource-sharing declarations (attachments 5 to SWZ)
Award criteria
- Price (60% weight)
- Guarantee terms (40% weight)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej na rozbudowę ul. Bitwy Białostockiej w Białymstoku, drogi serwisowej wzdłuż ul. Gen. Wł. Andersa (ul. 1KDD) oraz drogi do spalarni (ul. 4KD-L, ul. 2KD-L)..
Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
