Engineering · Service contract
RN5 Tunnel de Gueule Rouge security upgrade
Upgrade and potential new construction of a tunnel on the RN5 road near Cilaos to improve circulation safety and address existing infrastructure issues.
- Deadline
- Closed 5 days ago
- Location
- Cilaos, Réunion, France
About the project
Upgrade and potential new construction of a tunnel on the RN5 road near Cilaos to improve circulation safety and address existing infrastructure issues. The project involves partial project management services for studies, public consultation, environmental assessments, and regulatory procedures.
Scope of work
Partial project management services for the RN5 tunnel security upgrade, including diagnostic studies, preliminary design phases, geotechnical investigations, public consultation, environmental assessments (water law, protected species, deforestation), and regulatory procedures (DUP, urban planning compatibility).
Deliverables
- Diagnostic report (DIAG)
- Preliminary studies (EP1, EP2)
- Geotechnical investigation supervision (MC1)
- Public consultation dossier (MC2)
- Environmental impact assessments (MC3 to MC8)
- Urban planning compatibility dossier (MC7)
- Declaration of Public Utility (MC9)
Required services
- project management
- engineering studies
- geotechnical supervision
- environmental assessment
- public consultation
- regulatory compliance
Pelenoir assessment
The project primarily involves engineering and technical planning for the upgrade of a road tunnel, with secondary components of project management and environmental sustainability assessments. The scope is focused on infrastructure diagnostics, geotechnical investigations, and regulatory compliance, rather than architectural design or urban planning.
-
Engineering 60%
Structural and civil engineering studies, geotechnical investigation supervision, and technical planning for the tunnel upgrade, including potential realignment or new construction.
-
Partial project management services, including coordination of studies, public consultation, environmental assessments, and regulatory procedures.
-
Sustainability 15%
Environmental impact assessments, including water law compliance, protected species considerations, deforestation studies, and sustainability-related regulatory procedures.
How to take part
Who can apply
- Compliance with French public procurement regulations
- No specific reserved procurement (none)
- Electronic invoicing required
What to submit
- Tender submission via the Région Réunion platform (the original notice
- Financial guarantee required (see cahier des charges)
Award criteria
- Price of services: 30 points
- Technical value: 60 points
- Environmental performance: 10 points
Source
Published on BOAMP. Original title: SÉCURISATION DE LA RN5 AU DROIT DU TUNNEL DE GUEULE ROUGE - COMMUNE DE CILAOS - PR28+569 / PR28+681 / MARCHE DE MAÎTRISE D’ŒUVRE PARTIELLE.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


