About the project

Provision of comprehensive investor and environmental supervision services for the construction of riverside promenades along the Nida River in Pińczów, including compliance with building regulations, environmental guidelines, and project documentation oversight.

Scope of work

Comprehensive investor and environmental supervision services for the construction of riverside promenades along the Nida River, ensuring compliance with Polish building regulations, environmental impact decisions, and project documentation standards. The supervision includes site monitoring, coordination of construction works, and adherence to environmental protection guidelines.

Deliverables

  • Supervision reports
  • Compliance documentation
  • Environmental impact monitoring records
  • Construction progress documentation

Required services

  • Investor supervision (nadzór inwestorski)
  • Environmental supervision (nadzór przyrodniczy)
  • Construction site monitoring
  • Project documentation oversight

Pelenoir assessment

The project involves the procurement of supervision services for the construction of riverside promenades along the Nida River. The primary focus is on project and construction management, covering investor and environmental oversight, compliance monitoring, and coordination of construction works. A secondary but explicit component is environmental supervision, ensuring adherence to sustainability and environmental protection guidelines.

  • Comprehensive investor supervision, including compliance oversight, construction site monitoring, coordination of works, and adherence to building regulations and environmental guidelines for the riverside promenade project.

  • Environmental supervision, including monitoring compliance with environmental protection guidelines, impact decisions, and green space management requirements for the riverside promenade.

How to take part

Who can apply

  • At least one completed service of comprehensive investor supervision for terrain development projects (e.g., promenades, riverbanks, parks, or squares) within the last three years
  • Team must include: a coordinator with road engineering supervision qualifications and 3+ years of experience as an investor supervisor; a hydrotechnical engineer; a structural engineer; a utilities engineer (water, sewage, heating, ventilation, gas); an electrical engineer; and an environmental supervisor with relevant qualifications and 2+ years of experience in green space management
  • Valid professional liability insurance for the scope of the contract

What to submit

  • Completed offer form
  • List of personnel assigned to the project with qualifications and experience documentation
  • List of previously executed services with references
  • Statutory declarations on exclusion criteria and compliance with participation conditions
  • Bid bond of 1,000 PLN
  • Documents confirming lack of exclusion grounds for all consortium members (if applicable)

Award criteria

  • Price (60% weight)
  • Experience of personnel assigned to the project (40% weight)

Tender documents

The visible document package includes the official contract notice (BZP_Ogłoszenie_Inspektor_Bulwary.pdf) and the terms of reference (SWZ_podp_Bulwary_Inspektor.pdf), which likely outline the scope, requirements, and procedural rules for the supervision services. Submission forms (e.g., zal_10_oswiadczenie_Wykonaw_Bulwary nad Nidą_insp.docx, zal_3_oswiadczenie_warunki_udzialu_Bulwary_insp.docx) are provided for bidders to declare compliance with eligibility and exclusion criteria. The package also contains templates for listing personnel (zal_6_wykaz_osob_Bulwary_insp.doc) and previously executed services (zal_8_wykaz_usług_Bulwary_inspektor.doc), along with a draft contract (zal_7_wzór_Umowa_nadzor_Bulwary.docx) and an environmental decision document (zal_11_DECYZJA OSTATECZNA BRAK OOŚ.pdf). The exact contents of the Word and PDF files remain unverified, as the files were not downloaded.

Source

Published on e-Zamowienia. Original title: Pełnienie usługi kompleksowego nadzoru inwestorskiego i przyrodniczego nad wykonaniem robót budowlanych prowadzonych w ramach projektu: „Bulwary nad Nidą”.

Summary and assessment prepared by Pelenoir from the public notice (28 Nov 2026). The original notice and its documents are binding. Page updated 27 Nov 2026.