About the project

Appointment of an investor supervision inspector to oversee the design and construction of water retention infrastructure in Świątniki Górne municipality under a 'design and build' contract. The inspector will review project documentation, ensure compliance with functional and regulatory requirements, and supervise construction quality and adherence to approved plans.

Scope of work

The contractor will act as the investor supervision inspector for the water retention development project in Świątniki Górne municipality. Responsibilities include reviewing and approving design documentation, ensuring compliance with functional and regulatory requirements, providing technical advice, and supervising construction quality and adherence to approved plans and permits.

Deliverables

  • Supervision of design documentation development
  • Supervision of construction works
  • Technical and compliance assessments
  • Regular reporting and coordination with the client

Required services

  • Investor supervision (inspektor nadzoru inwestorskiego)
  • Technical consulting and advisory services
  • Quality control and compliance verification

Pelenoir assessment

This project focuses on the supervision and technical oversight of water retention infrastructure development in a rural municipality. The primary scope involves project and construction management services, including compliance verification, quality control, and coordination during the design and build phases. A secondary but critical component involves engineering and technical planning, specifically in hydrotechnical consulting and regulatory adherence.

  • Supervision of the design and construction phases of water retention infrastructure, including review of project documentation, compliance verification, quality control, and coordination with the client and contractor under a 'design and build' contract.

  • Technical consulting and advisory services related to hydrotechnical engineering, including compliance assessments, regulatory adherence, and quality verification of water retention infrastructure.

How to take part

Who can apply

  • Contractor must provide at least one person with unlimited construction supervision qualifications in hydrotechnical engineering (uprawnienia budowlane bez ograniczeń w specjalności inżynieryjnej hydrotechnicznej)
  • The assigned inspector must have experience in supervising or managing at least one completed hydrotechnical construction or reconstruction project

What to submit

  • Offer prepared in Polish
  • Submission via electronic procurement platform (platformazakupowa.pl)
  • Compliance with technical and organisational requirements for electronic communication

Award criteria

  • Price (60% weight)
  • Professional experience of the assigned inspector (40% weight)

Source

Published on e-Zamowienia. Original title: Pełnienie funkcji inspektora nadzoru inwestorskiego nad realizacja zadania pn.: „Rozwój retencji w gminie Świątniki Górne”.

Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 26 Nov 2026.