Engineering · Service contract
Retention reservoir construction at Sowinko forestry division 631d
Preparation of design and cost documentation, obtaining environmental and construction permits, and providing authorial supervision for the construction of a retention reservoir based on an existing artificial water reservoir in Sowinko forestry division 631d.
- Deadline
- Closed 8 days ago
- Location
- Trawica, West Pomeranian, Poland
About the project
Preparation of design and cost documentation, obtaining environmental and construction permits, and providing authorial supervision for the construction of a retention reservoir based on an existing artificial water reservoir in Sowinko forestry division 631d.
Scope of work
Preparation of complete design and cost documentation (including environmental and construction permits) and authorial supervision for the construction of a retention reservoir based on an existing artificial water reservoir. The documentation must comply with Polish regulations for hydrotechnical structures and enable the selection of a contractor for construction works.
Deliverables
- Design and cost documentation (Dokumentacja Projektowa)
- Environmental permits
- Construction permits
- Authorial supervision during construction (Nadzór Autorski)
Required services
- Architectural and engineering design services
- Cost estimation
- Project supervision
- Environmental consulting
Pelenoir assessment
This project primarily involves engineering and technical planning for the design of a retention reservoir, a hydrotechnical structure. Secondary aspects include project and construction management (authorial supervision) and specialist consulting (environmental permitting). The scope is focused on technical design, regulatory compliance, and construction oversight, with no indication of architectural design, urban planning, or interior work.
-
Engineering 70%
Design and technical planning for the retention reservoir, including hydrotechnical engineering, structural calculations, and compliance with Polish regulations for water infrastructure.
-
Authorial supervision during the construction phase to ensure compliance with the design documentation and regulatory requirements.
-
Environmental consulting to secure environmental permits and ensure compliance with environmental regulations for the retention reservoir.
How to take part
Who can apply
- Contractor must demonstrate experience in preparing design documentation for hydrotechnical structures (at least one project in the last 3 years worth ≥ PLN 80,000)
- Contractor must designate a project designer with unlimited hydrotechnical engineering qualifications
- Compliance with Polish Public Procurement Law and construction regulations
What to submit
- Offer form (załącznik nr 2 do SWZ)
- Documentation demonstrating experience and qualifications
- Guarantee (wadium) of PLN 2,500 in specified forms
Award criteria
- Price (60% weight)
- Designer experience (40% weight): points awarded based on the number of hydrotechnical project documentations completed in the last 5 years
Tender documents
The visible document package includes two files: a PDF titled 'SWZ - Specyfikacja Warunków Zamówienia' and a ZIP archive named 'Załaczniki do SWZ'. The PDF likely contains the full tender conditions, scope of work, eligibility criteria, submission requirements, and evaluation methodology for the design and supervision services. The ZIP archive probably includes supplementary materials such as standard forms, templates for submissions, technical appendices, and possibly preliminary drawings or site plans related to the retention reservoir project. The exact contents of the ZIP file cannot be confirmed without access, but the filenames suggest a mix of administrative and technical documents. No detailed design files or final construction plans are explicitly mentioned.
Source
Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo – kosztorysowej oraz nadzór autorski dla zadania: Budowa zbiornika retencyjnego na bazie istniejącego, sztucznego zbiornika wodnego – II postępowanie.
Summary and assessment prepared by Pelenoir from the public notice (7 Nov 2026). The original notice and its documents are binding. Page updated 6 Nov 2026.