Image 1 from the tender documents: Renovation of two 1950s bascule bridges in Gouda, Gouda, Netherlands Image 2 from the tender documents: Renovation of two 1950s bascule bridges in Gouda, Gouda, Netherlands
2 images from the tender documents, TenderNed

About the project

Renovation of the Pottersbrug and Rabatbrug, two movable bascule bridges built around 1957. The project includes replacing steel bridge decks, mechanical and electrical installations, structural reinforcements of the substructure, restoration of civil and structural elements, and integration with the Central Bridge Management system (COB). The work is carried out in a two-phase construction team (bouwteam) process: a design phase followed by a realization phase under a construction team agreement.

Scope of work

The contract covers the renovation of two movable bascule bridges (Pottersbrug and Rabatbrug) through a two-phase construction team (bouwteam) process. Phase 1 is the design and preparation phase (bouwteamfase), and Phase 2 is the realization phase under the construction team agreement. The scope includes replacing steel bridge decks, mechanical and electrical installations, structural reinforcements, civil and structural repairs, and integration with the Central Bridge Management system (COB). The contractor must participate in the design phase and is intended to execute the realization phase.

Deliverables

  • New steel bridge decks
  • Replacement of mechanical installations
  • Replacement of electrical and automation installations (E/IA)
  • Structural reinforcements of the substructure
  • Restoration of civil and structural elements
  • Integration with Central Bridge Management system (COB)

Required services

Pelenoir assessment

The project primarily involves the renovation of two movable bascule bridges, with a strong focus on engineering and technical planning for structural, mechanical, electrical, and civil works. The two-phase construction team (bouwteam) process also necessitates project and construction management for design coordination and execution, as well as physical construction and general contracting for the realization phase.

  • Structural, mechanical, electrical, and civil engineering for the renovation of the two movable bascule bridges, including steel deck replacement, mechanical and electrical installations, structural reinforcements, and integration with the Central Bridge Management system (COB).

  • Management of the two-phase construction team (bouwteam) process, including coordination of the design phase and subsequent realization phase, ensuring compliance with timelines, budgets, and contractual agreements.

  • Physical execution of the renovation works, including installation of new steel bridge decks, mechanical and electrical systems, structural reinforcements, and civil repairs during the realization phase.

How to take part

Who can apply

  • Participation is not reserved
  • Submission via TenderNed is required
  • Uniform European Procurement Document (UEA) is used for selection criteria
  • Minimum and maximum of 5 candidates invited for the second phase

What to submit

  • Submissions must be in Dutch
  • Electronic submission is required via TenderNed
  • Uniform European Procurement Document (UEA) must be completed
  • Reference projects for selection criteria must be provided

Award criteria

  • Price (20% weight)
  • Quality (80% weight)

Tender documents

The visible document package includes the official tender notice in PDF format, detailing the procurement process and legal framework. Functional and technical specifications for the movable bridges are provided in a separate PDF, likely covering design requirements, performance criteria, and integration with the Central Bridge Management system. Selection guidelines and reference project templates are included as both PDF and DOCX files, outlining eligibility, experience requirements, and evaluation criteria for contractors. Contract-related documents, such as the construction team agreement (bouwteamovereenkomst) and general procurement conditions, are also present, along with declarations and compliance forms. A ZIP file labeled 'Impressie' may contain visual materials like drawings, photos, or 3D models of the existing bridges or proposed designs, but its exact contents cannot be confirmed without access.

Images from the tender documents

Source

Published on TenderNed. Original title: Bouwteam renovatie Potters- en Rabatbrug.

Summary and assessment prepared by Pelenoir from the public notice (18 Nov 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.