Engineering · Service contract
Government office MEP upgrade: gas-free heating and future-proof systems
Design and technical preparation for the upgrade, replacement and sustainability retrofit of primary electrical and mechanical installations in the Walterboscomplex, a government office building in Apeldoorn.
- Deadline
- 20 days left to apply
- Location
- Apeldoorn, Netherlands
About the project
Design and technical preparation for the upgrade, replacement and sustainability retrofit of primary electrical and mechanical installations in the Walterboscomplex, a government office building in Apeldoorn. The project includes a technically ready design (preliminary, definitive and technical design) with specifications and drawings, as well as necessary structural and construction works. The goal is to eliminate natural gas use for space heating by integrating residual heat from a government data centre.
Scope of work
Deliverables
- Technically ready design (preliminary, definitive and technical design) including specifications and drawings
- Structural and construction works (temporary, preparatory and definitive)
- Risk dossier for the design process
- Submission of references
Required services
- Engineering services for electrical and mechanical installations
- Design management
- Risk management for the design process
Pelenoir assessment
This project focuses on the technical design and engineering of mechanical and electrical installations for a government office building, with a strong emphasis on sustainability. The primary scope involves upgrading and retrofitting MEP systems, while secondary aspects address sustainability and energy performance to achieve gas-free heating.
-
Engineering 80%
Design and technical preparation for the upgrade, replacement, and sustainability retrofit of primary electrical and mechanical installations, including integration of residual heat from a government data centre for gas-free space heating. This includes structural and construction works directly related to the MEP systems.
-
Sustainability 20%
Sustainability aspects of the MEP upgrade, including the elimination of natural gas use for space heating and the integration of residual heat from a government data centre to ensure future-proof, energy-efficient systems.
How to take part
Who can apply
- Submission of the Uniform European Procurement Document (UEA)
- Minimum of three candidates to be invited for the second phase
What to submit
- Completed tender form (Inschrijvingsbiljet)
- Completed tender form for combinations (Inschrijvingsbiljet combinaties)
- Design cost budget (inschrijfbegroting ontwerpkosten)
- Risk dossier (Format Risicodossier)
- Confidentiality declaration
- References form (opgave referenties)
- Uniform European Procurement Document (UEA)
Award criteria
- Price (weight: 0, using 'Award on value' methodology)
- Integral, buildable and maintainable design (quality criterion, weight: 0)
- Organisation of the design process (quality criterion, weight: 0)
- Risk dossier for the design process (quality criterion, weight: 0)
Tender documents
The visible document package includes PDF files such as the original tender notice, two procurement guides for the competitive dialogue procedure (one for the registration phase and one for the dialogue and submission phase), and various forms including a tender form, confidentiality declaration, and reference submission form. Excel files provide a budget template for design costs and a risk dossier format. A Word document contains a reference submission template. The package likely covers all contractual, procedural and technical requirements for participation, including design guidelines, risk management frameworks, and submission instructions. However, the exact content of the drawings, detailed technical specifications, or full design briefs cannot be confirmed without accessing the files.
Source
Published on TenderNed. Original title: 36304 | Ontwerpen opwaarderen primaire E+W installaties Walterboscomplex, Belastingdienst te Apeldoorn.
Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 14 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.