About the project

Urban planning and redesign of the public square around the Church and Chapel in Mignières, including landscape and infrastructure improvements under a master planning and design contract.

Scope of work

Master planning and design services for the redevelopment of the Church and Chapel Square in Mignières, including urban design, landscape architecture, and infrastructure improvements. The contract duration is 48 months.

Deliverables

  • Master plan and design proposals for public space redevelopment
  • Urban design and landscape architecture documentation

Required services

  • Master planning (maîtrise d’œuvre)
  • Urban design
  • Landscape architecture
  • Engineering coordination

Pelenoir assessment

This project primarily involves the redevelopment of a public square, combining urban design and master planning with landscape architecture and engineering coordination. The focus is on spatial planning, public realm design, and infrastructure improvements, supported by technical engineering services.

  • Master planning and urban design for the redevelopment of the Church and Chapel Square, including spatial organization, public realm integration, and urban infrastructure coordination.

  • Design of outdoor spaces, planting, landscape elements, and integration of natural features within the square’s redevelopment.

  • Technical engineering coordination for infrastructure improvements, including civil works, utilities, and structural elements of the public space.

How to take part

Who can apply

  • Conditions specified in the consultation regulations (règlement de consultation)
  • Technical, economic, and financial capacity requirements as defined in the consultation regulations

What to submit

  • Details specified in the consultation regulations (règlement de consultation)

Award criteria

  • Criteria specified in the consultation regulations (règlement de consultation)

Source

Published on BOAMP. Original title: Maîtrise d’œuvre pour l’aménagement et la réurbanisation de la place de l’Eglise et de la Chapelle de Mignières.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 5 Oct 2026.