About the project

Design documentation for the reconstruction of county road 1072R, including new pavement layers, pedestrian and cycling paths, safe pedestrian crossings with renewable energy lighting, stormwater drainage, bus bays, roundabout intersection, and necessary permits and approvals.

Scope of work

Design documentation for the reconstruction of approximately 2.8 km of county road 1072R, including new pavement layers, pedestrian and cycling paths, safe pedestrian crossings with renewable energy lighting, stormwater drainage, bus bays, roundabout intersection, and necessary permits and approvals.

Deliverables

  • Design documentation for road reconstruction
  • New pavement layers for the road
  • Pedestrian and cycling paths
  • Safe pedestrian crossings with renewable energy lighting
  • Stormwater drainage system
  • Bus bays or platforms if applicable
  • Roundabout intersection design
  • Documentation for relocation of existing telecommunication and electrical infrastructure if necessary
  • Water permit and environmental decision if required
  • Traffic organization project

Required services

  • Engineering design services
  • Project preparation and cost estimation
  • Project and documentation supervision

Pelenoir assessment

This project primarily involves engineering and technical planning for the reconstruction of a county road, including pavement, drainage, and intersection design. A secondary but explicit component is urban design and planning, focusing on pedestrian and cycling infrastructure, safe crossings, and traffic organization. The scope is firmly grounded in civil and transportation engineering, with urban design elements integrated to enhance accessibility and sustainability.

  • Design and technical planning for the reconstruction of county road 1072R, including pavement layers, stormwater drainage, bus bays, roundabout intersection, and relocation of existing infrastructure. This also covers engineering calculations, technical drawings, and compliance with road and transportation standards.

  • Integration of pedestrian and cycling paths, safe pedestrian crossings with renewable energy lighting, and traffic organization to ensure accessibility and sustainability within the road reconstruction project.

How to take part

Who can apply

  • No restrictions to specific contractors (art. 94 ustawy not applied)
  • Employment of administrative staff on employment contracts for certain tasks (unless personally performed by the contractor)

What to submit

  • Electronic offer form generated and filled in
  • Statement on lack of exclusion grounds (Attachment No. 2)
  • For joint bidders: individual statements on lack of exclusion grounds and joint statement (Attachment No. 4)
  • Power of attorney for joint bidders (if applicable)

Award criteria

  • Price (60% weight)
  • Payment term (40% weight)

Tender documents

The visible document package includes four files: a draft contract (Projekt umowy.pdf), tender specifications (SWZ.pdf), a statement form on exclusion grounds (Załącznik nr 2 - Oświadczenie o braku podstaw wykluczenia.doc), and a joint bidder declaration form (Załącznik nr 4 Oświadczenie Wykonawców wspólnie.docx). The contract draft likely contains the proposed terms and conditions for the design services. The SWZ (Specyfikacja Warunków Zamówienia) probably details the technical requirements, scope of work, and submission guidelines. The statement forms are standard procurement documents for confirming eligibility. The exact content of the files is inferred from their filenames and the tender context, but the actual contents have not been downloaded or verified.

Source

Published on e-Zamowienia. Original title: Przebudowa drogi powiatowej Nr 1072R Podolszynka Ordynacka – Lipiny – opracowanie dokumentacji.

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.