About the project

Preparation of design documentation for the reconstruction of a road section on Kmicica Street and the traffic system at Primary School No. 1 in Polkowice, including the adaptation of part of the school playground into a parking area. The project involves four stages: two design concepts, selection of the final concept, preparation of construction documentation, and obtaining necessary permits.

Scope of work

Preparation of design documentation for the reconstruction of Kmicica Street and the traffic system at Primary School No. 1 in Polkowice, including two conceptual variants, selection of the final concept, preparation of construction and technical documentation, and obtaining necessary permits for the project.

Deliverables

  • Two conceptual design variants for the road section and parking area
  • Final selected design concept
  • Construction project documentation (for obtaining permits)
  • Technical project documentation
  • Applications for administrative decisions (permits)

Required services

  • architectural and engineering design services
  • urban planning and traffic system design
  • preparation of construction documentation for permits
  • technical design documentation

Pelenoir assessment

This project primarily involves engineering and technical planning for the reconstruction of a road section and traffic system at a school, including the preparation of construction documentation and permits. Urban design and planning are also significant for organizing the spatial layout of the school premises, while architectural design plays a minor role in integrating the new infrastructure with the existing environment.

  • Design of the road section reconstruction, traffic system redesign, and technical infrastructure (e.g., electrical, water-sewerage networks) for the school area, including preparation of construction and technical documentation for permits.

  • Urban planning and spatial organization of the traffic system at the school, including the adaptation of the playground into a parking area and integration with the surrounding road network.

  • Architectural integration of the redesigned traffic system and parking area with the existing school infrastructure, ensuring functional and aesthetic coherence.

How to take part

Who can apply

  • Minimum three completed road infrastructure projects in the last 5 years, including at least one worth at least 60,000 PLN gross
  • At least one person with construction licenses for road, electrical, and water-sewerage network design

What to submit

  • Offer in Polish
  • Documents submitted electronically via the e-Zamówienia platform
  • Required attachments: references, personnel list, company registration documents, declarations on exclusion criteria

Award criteria

  • Price (60% weight)
  • Completion time for Stage III (design documentation) (40% weight)

Tender documents

The visible ZIP file, titled 'SWZ_z_zalacznikami podpisane.zip', likely contains the full tender documentation package, including the Specification of Contract Conditions (SWZ). Based on the filename and typical Polish public procurement practices, this package probably includes detailed contract terms, technical requirements, submission forms, and appendices such as templates for declarations, references, and personnel lists. It may also contain preliminary design briefs, site plans, or graphical attachments referenced in the tender. However, the exact contents of the ZIP file cannot be confirmed without access, and no specific drawings or detailed technical documents are visibly listed outside this archive.

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla przebudowy pasa drogowego ul. Kmicica oraz układu komunikacyjnego na terenie Szkoły Podstawowej nr 1 w Polkowicach.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 23 Sep 2026.