About the project

Preparation of complete design documentation for the construction of a photovoltaic farm combined with the demolition of the 1000th Anniversary Stadium in Wałbrzych. The project includes three stages: (1) design documentation for photovoltaic installations and stadium demolition, (2) site development after demolition, including parking spaces, storage building, and fencing, and (3) formal-legal documentation for environmental and water permits.

Scope of work

The tender requires the preparation of complete design documentation for a photovoltaic farm and the redevelopment of a sports facility in Wałbrzych. This includes demolition of the existing stadium, design of photovoltaic installations, site development (parking, storage building, fencing), and formal-legal documentation for environmental and water permits. The project is divided into three stages with specific deliverables for each.

Deliverables

  • Design documentation for photovoltaic farm construction and stadium demolition (Stage I)
  • Design documentation for site development after demolition, including parking, storage building, and fencing (Stage II)
  • Formal-legal documentation for environmental and water permits (Stage III)
  • Project execution plans, construction permits, and cost estimates
  • Electronic and paper versions of all documentation

Required services

  • Architectural design
  • Structural engineering design
  • Electrical engineering design for photovoltaic installations
  • Environmental impact assessment
  • Preparation of construction permits and administrative approvals
  • Cost estimation and scheduling

Pelenoir assessment

The project primarily involves engineering and technical planning for a photovoltaic farm and the redevelopment of a sports facility, including demolition, site development, and renewable energy infrastructure. Architectural design and sustainability-related documentation (environmental permits) are secondary but integral components of the scope.

  • Design of photovoltaic installations, structural engineering for demolition, electrical engineering for renewable energy infrastructure, and technical planning for site development (parking, storage building, fencing).

  • Architectural design for site development after demolition, including layout planning for parking, storage buildings, and fencing, as well as conceptual integration of the photovoltaic farm with the redeveloped area.

  • Preparation of formal-legal documentation for environmental and water permits, including environmental impact assessments and compliance with renewable energy regulations.

How to take part

Who can apply

  • At least one person with unlimited electrical engineering design qualifications (Polish construction law)
  • At least one person with unlimited structural engineering design qualifications (Polish construction law)

What to submit

  • Offer in electronic form with qualified, trusted, or personal signature
  • Statements confirming lack of exclusion grounds (art. 125 ust. 1 ustawy)
  • Power of attorney (if applicable)
  • Documentation proving qualifications of key personnel
  • Electronic versions of design documentation in editable and PDF formats
  • Paper copies of project documentation (2 copies)

Award criteria

  • Price (100% weight)

Source

Published on e-Zamowienia. Original title: Koncepcja rozwoju Wałbrzyskiego Klastra Energetycznego dokumentacja projektowa dla Wałbrzyskiego Centrum Sportowo-Rekreacyjnego „AQUA-ZDRÓJ” Sp. z o.o.”- Dokumentacja projektowa dla budowy farmy ....

Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.