About the project

Design documentation for the construction of pedestrian paths and bus bays along a 4 km section of national road DK25 in Ose and Oska Piła, including author supervision during construction.

Scope of work

Preparation of design documentation (building permit design and execution design) for pedestrian paths and bus bays along national road DK25, including obtaining necessary permits, responding to contractor queries, and providing author supervision during construction.

Deliverables

  • Building permit design
  • Execution design (for permanent and temporary solutions)
  • Author supervision during construction
  • Responses to contractor queries and design modifications

Required services

  • Road design engineering
  • Author supervision
  • Permit and approval coordination

Pelenoir assessment

This project primarily involves engineering and technical planning for the design of pedestrian infrastructure along a national road, with a secondary focus on author supervision and construction-phase coordination. The scope is dominated by road design and technical documentation, supported by project management tasks during implementation.

  • Design of pedestrian paths and bus bays along national road DK25, including structural, civil, and technical engineering for road infrastructure, drainage, and safety features.

  • Author supervision during construction, coordination of permit approvals, and responses to contractor queries to ensure compliance with design documentation.

How to take part

Who can apply

  • Contractor must demonstrate experience in designing roads of at least class G
  • Project manager must hold unlimited road design qualifications
  • Project manager must have experience in at least one similar road design project

What to submit

  • Completed offer form
  • Price form (Tom IV SWZ)
  • Non-price criteria form (optional)
  • Company registration documents
  • Power of attorney (if applicable)
  • List of completed services (with references)
  • List of personnel with qualifications and experience

Award criteria

  • Price (60%)
  • Experience of the road design project manager (40%)

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej dla zadania pn.: „Budowa dróg dla pieszych w ciągu DK25 w m. Ose i Oska Piła” oraz pełnienie nadzoru autorskiego w czasie realizacji robót budowlanych.

Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 26 Nov 2026.