About the project

Design of a two-storey, non-basement fire station building with a garage for rescue and firefighting vehicles, social and office rooms, and a civil defence storage facility in Zarzecze, Nisko municipality. The project includes architectural, technical, and execution design, cost estimates, and obtaining all necessary administrative approvals and building permits.

Scope of work

Preparation of complete design documentation for a fire station and civil defence storage building, including architectural, technical, and execution designs, cost estimates, bills of quantities, and obtaining all necessary administrative approvals and building permits. The design must comply with accessibility standards for disabled persons and universal design principles.

Deliverables

  • architectural and construction design
  • technical design (divided by disciplines)
  • execution design
  • cost estimates and bills of quantities
  • technical specifications for execution and acceptance of construction works (STWiORB)
  • BIOZ safety and health protection information
  • geotechnical documentation
  • rainwater management design and water law permit (if required)
  • electronic and editable versions of all documents

Required services

  • architectural design
  • structural engineering
  • sanitary installations (water, sewage, heating, ventilation, gas, air conditioning)
  • electrical installations (power sockets, PV system with 20 kW capacity and 40 kWh energy storage, alarm, LED lighting, external lighting, evacuation system, earthing, LAN with access point, monitoring, access control, energy connection)
  • obtaining maps for design and opinion purposes
  • obtaining land registry maps and excerpts
  • obtaining technical conditions from utility providers
  • obtaining coordination approval from the Nisko District Starosty
  • error correction during design and construction phases without additional remuneration

Pelenoir assessment

This project primarily involves the design of a fire station and civil defence storage building, requiring architectural and engineering expertise. The scope includes architectural design, structural and technical engineering, and project coordination to obtain necessary approvals and permits. The focus is on delivering complete design documentation for construction.

  • Architectural concept and building design for the fire station and civil defence storage facility, including spatial arrangement, functional layout, and compliance with accessibility standards and universal design principles.

  • Structural engineering, sanitary installations (water, sewage, heating, ventilation, gas, air conditioning), electrical installations (power, PV system, alarm, lighting, monitoring, access control), and geotechnical documentation for the building.

  • Coordination of design phases, obtaining administrative approvals and building permits, and ensuring compliance with technical and legal requirements during the design process.

How to take part

Who can apply

  • compliance with Polish Public Procurement Law (ustawa Pzp)
  • submission of required statements and documents (e.g., no grounds for exclusion, meeting participation conditions)
  • consortium members must appoint a joint representative
  • foreign entities must provide equivalent documents from their country of origin

What to submit

  • project documentation in four hard copies (architectural, technical, execution design)
  • cost estimates, bills of quantities, STWiORB, and BIOZ in two hard copies
  • one electronic copy of all documents (including editable versions)
  • designer's statement on completeness and compliance of the documentation
  • all documents in Polish
  • submission via e-Zamówienia platform or email (the contact listed in the original notice)

Award criteria

  • Price (60% weight)
  • Payment terms (40% weight)

Tender documents

The visible document package includes a ZIP file named 'SWZ z Załacznikami ZP.26.zip', which likely contains the full tender documentation, such as the Specyfikacja Warunków Zamówienia (SWZ), contractual terms, submission forms, and possibly preliminary design sketches or technical requirements. The ZIP file is expected to include multiple PDFs or editable documents related to the design and administrative process. Additionally, a PDF file named 'Komunikacja-w-postepowaniu-5.1.pdf' is present, which probably outlines the procedural communication rules for the tender process. The exact contents of the ZIP file cannot be confirmed without downloading, but the filenames suggest a focus on contractual and procedural documents rather than detailed architectural plans or engineering drawings.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej budowy budynku dla OSP w Zarzeczu wraz z magazynem obrony cywilnej.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.