Interior architecture · Service contract
Office space adaptation at Fordońska 19 in Bydgoszcz
Design and documentation for the adaptation of first-floor rooms into office space in an existing building, including interior design, multi-discipline engineering, furniture planning and author supervision during construction.
- Deadline
- Closed 40 days ago
- Location
- Bydgoszcz, Kuyavian-Pomeranian, Poland
- Declared value
- PLN 222 261 (≈ EUR 49 835)
About the project
Design and documentation for the adaptation of first-floor rooms into office space in an existing building, including interior design, multi-discipline engineering, furniture planning and author supervision during construction.
Scope of work
Complete multi-discipline design documentation for converting first-floor rooms into office space, including architectural, structural, mechanical, electrical and interior design, furniture planning, cost estimation and author supervision during construction.
Deliverables
- complete multi-discipline design documentation
- interior design and furniture planning
- cost estimation
- author supervision during construction
Required services
- architectural design
- structural engineering
- mechanical and electrical engineering
- interior design
- cost estimation
- author supervision
Pelenoir assessment
This project focuses on the adaptation of existing building spaces into office areas, with a primary emphasis on interior architecture and design. It also includes architectural and multi-discipline engineering work to support the renovation, ensuring compliance with technical and regulatory requirements.
-
Interior architecture, space planning, furniture integration, and interior design for the adaptation of first-floor rooms into office space, including layout optimization and material selection.
-
Architecture 30%
Architectural design for the adaptation of existing building spaces, including coordination of multi-discipline engineering and compliance with building regulations.
-
Engineering 20%
Structural, mechanical, and electrical engineering for the adaptation of the existing building, including technical systems integration and compliance with safety standards.
How to take part
Who can apply
- no exclusion grounds (art. 108, 109 ustawy Pzp and art. 7 ustawy sankcyjnej)
- valid registration in Polish KRS or CEIDG or equivalent foreign registry
- consortium members must each meet eligibility requirements
- no use of subcontractors from non-EU/non-WTO countries
What to submit
- offer form (Załącznik nr 2 do SWZ)
- declaration of eligibility and no exclusion grounds (Załącznik nr 3 do SWZ)
- power of attorney if acting through a representative
- consortium agreement if applicable
- documents confirming equivalent solutions if proposed
Award criteria
- price (100%)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej adaptacji pomieszczeń na potrzeby wykonania powierzchni biurowej w budynku przy ul. Fordońskiej 19 w Bydgoszczy.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 2 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
