Project and construction management · Service contract
Nyköping Travel Centre Construction Supervision
Construction supervision for groundworks: where oversight of execution becomes the quiet foundation of daily mobility.
- Deadline
- 12 days left to apply
- Location
- Nyköping, Södermanland County, Sweden
- Declared value
- SEK 1 (≈ EUR 0)
About the project
Consultancy services for construction site supervision (BPU) during the execution of a groundworks contract for the development of Nyköping Travel Centre.
Why it matters
Construction supervision for groundworks ensures on-site oversight, turning municipal infrastructure into daily reliability.
Scope of work
Consultancy services for construction site supervision (BPU) during the execution of a groundworks contract for Nyköping Travel Centre. Services include technical advice, infrastructure consultancy, and construction supervision.
Deliverables
- construction site supervision (BPU)
Required services
- building technical consultancy
- infrastructure consultancy
- construction supervision
Pelenoir assessment
The project scope is explicitly focused on construction supervision and technical consultancy services for a groundworks contract at Nyköping Travel Centre. No other AEC business groups are supported by the extracted facts, as the tender does not include architectural design, engineering, or other disciplines.
-
Construction site supervision (BPU), including technical advice, infrastructure consultancy, and oversight of groundworks execution for Nyköping Travel Centre.
How to take part
Who can apply
- compliance with administrative provisions (ABK 09)
- submission of required qualification and mandatory requirements (skall-krav)
What to submit
- administrative provisions (ABK 09)
- qualification and mandatory requirements (skall-krav)
- evaluation criteria
- oath of truth (sanningsförsäkran)
- subcontractor list
- code of conduct
- invoicing provisions
- European Single Procurement Document (ESPD)
- draft contract for construction supervision
Tender documents
The visible document package includes administrative provisions (ABK 09), qualification and mandatory requirements, evaluation criteria, and a draft contract for construction supervision. There are also submission forms such as the European Single Procurement Document (ESPD), an oath of truth, and a subcontractor list. Supporting documents cover invoicing provisions and a code of conduct. A ZIP file labeled 'BPU (1).zip' likely contains additional technical or project-specific materials, but its exact contents cannot be confirmed without access.
Source
Published on e-Avrop. Original title: Konsulter för byggplatsuppföljning (BPU).
Summary and assessment prepared by Pelenoir from the public notice (10 Nov 2026). The original notice and its documents are binding. Page updated 28 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


