Project and construction management · Service contract
Inspection Services for Construction and Green Areas
Inspection services under AB 04/ABT 06: the quiet quality control that shapes daily use before handover.
- Deadline
- 5 days left to apply
- Location
- Motala, Östergötland County, Sweden
- Declared value
- SEK 1.5 m (≈ EUR 133 678)
About the project
Framework agreement for inspection services covering ground and civil engineering works as well as green area installations, performed in accordance with AB 04 or ABT 06 standards.
Why it matters
Inspection services under AB 04/ABT 06 ensure quality control for ground and green areas, drafting the daily use of these spaces before handover.
Scope of work
Inspection services for ground and civil engineering works (Lot 1) and green area installations (Lot 2) under a ranked framework agreement. Services must comply with AB 04 or ABT 06 standards.
Deliverables
- inspection reports for ground and civil engineering works
- inspection reports for green area installations
Required services
- inspection of construction and civil engineering works
- inspection of green area installations
Pelenoir assessment
This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT due to its focus on inspection services for ground and civil engineering works and green area installations. The scope does not explicitly support other AEC business groups such as design, engineering, or landscape architecture, as the primary deliverables are inspection reports and compliance verification.
-
Inspection and quality assurance services for ground and civil engineering works (Lot 1) and green area installations (Lot 2), ensuring compliance with AB 04 or ABT 06 standards.
How to take part
What to submit
- completed tender submission via e-Avrop platform
- reference forms for Lot 1 and Lot 2
- compliance with administrative provisions (Administrativa föreskrifter)
Award criteria
- Price
Tender documents
The visible document package includes administrative provisions in DOCX format, reference forms for both lots in DOC format, and PDF files labeled 'Skakrav' (mandatory requirements) and 'Utvärderingsmodell' (evaluation model). The reference forms likely require details about past project experience for Lot 1 (ground and civil engineering) and Lot 2 (green areas). The evaluation model PDF probably outlines the scoring methodology for tender assessment. The exact content of these files remains unknown because access requires login, and no file previews or descriptions beyond filenames and labels are available.
Source
Published on e-Avrop. Original title: Besiktning Mark- och anläggningsentreprenader samt grönytor.
Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.




