About the project

Construction of a new sustainable sports center with a sports hall and swimming pool at Sportpark Adegeest in Voorschoten. The project includes the selection of an integrated design team comprising an architect and structural engineer to develop the submission design (SO) and preliminary design (VO), followed by further development in a construction team from the definitive design (DO) stage onward.

Scope of work

Selection of an integrated design team (architect and structural engineer) to develop the submission design (SO) and preliminary design (VO) for a new sustainable sports center with a sports hall and swimming pool. The team will collaborate with installation advisors and building physics/ fire safety consultants. From the definitive design (DO) stage onward, the design will be further developed in a construction team with executing parties. The architect and structural engineer retain primary design responsibility through VO and DO, shifting to a supervisory role during technical design (TO), execution design (UO), and realization.

Deliverables

  • Submission design (SO)
  • Preliminary design (VO)
  • Definitive design (DO) in collaboration with executing parties

Required services

  • Architectural design
  • Structural engineering
  • Collaboration with installation advisors
  • Collaboration with building physics and fire safety consultants

Pelenoir assessment

The project scope focuses on the design of a new sustainable sports center, requiring an integrated design team comprising an architect and structural engineer. The architect leads the architectural and spatial design, while the structural engineer provides technical planning and engineering support. The project does not explicitly include urban planning, landscape architecture, or interior design as primary disciplines, nor does it cover construction, project management, or sustainability certification beyond general sustainability goals.

  • Development of the architectural concept, building design, and spatial organization for the new sustainable sports center, including the sports hall and swimming pool. This includes the submission design (SO) and preliminary design (VO) stages, where the architect leads the design process.

  • Structural engineering for the sports center, including load-bearing calculations, foundation design, and structural integrity of the sports hall and swimming pool. Collaboration with installation advisors and building physics/fire safety consultants to integrate technical systems into the design.

How to take part

Who can apply

  • Selection based on Uniform European Procurement Document (UEA)
  • Minimum of 5 and maximum of 5 candidates invited to the second phase
  • Electronic submission required via TenderNed

What to submit

  • Uniform European Procurement Document (UEA)
  • Reference declarations (Bijlage B.1-B.8)
  • Checklist of documents to be submitted (Bijlage C)
  • Self-declaration regarding exclusion grounds related to Russia sanctions (Bijlage D)

Award criteria

  • Quality (80% weight)
  • Price (20% weight)

Tender documents

The visible document package includes the original tender notice in PDF format, selection guidelines for the design team, and the Uniform European Procurement Document (UEA) as a standardized form. There are eight reference declaration templates (Bijlage B.1-B.8) in DOCX format for demonstrating prior experience, along with a checklist (Bijlage C) outlining required submission documents. A self-declaration form (Bijlage D) addresses exclusion grounds related to Russia sanctions. The ZIP file appears to bundle all these documents for download. The exact content of the reference declarations and detailed design requirements is not visible, but the files likely support the selection and submission process for the design competition.

Source

Published on TenderNed. Original title: Architect en constructeur sportcentrum Voorschoten.

Summary and assessment prepared by Pelenoir from the public notice (9 Nov 2026). The original notice and its documents are binding. Page updated 8 Nov 2026.