Architecture · Service contract
New sports hall: multidisciplinary design team and safety coordinator
Construction of a new municipal sports hall on the Kouterslag sports and recreation park.
- Deadline
- 38 days left to apply
- Location
- Merelbeke-Melle, East Flanders, Belgium
- Declared value
- EUR 585 000
About the project
Construction of a new municipal sports hall on the Kouterslag sports and recreation park. The project requires appointing a multidisciplinary design team (architect, structural engineer, building services, EPB reporting, safety coordination, acoustics, geotechnical studies and land surveying) and a safety coordinator for both design and execution phases.
Scope of work
Appointment of a multidisciplinary design team and safety coordinator for a new municipal sports hall. The team must include an architect, structural engineer, building services engineers (HVAC, sanitary, electrical, fire safety), EPB reporter, safety coordinator (design and execution), acoustics consultant, geotechnical engineer and land surveyor. Additional studies may include fire safety, accessibility, rainwater drainage, demolition monitoring, environmental studies, BIM coordination, sports technical equipment, acoustic simulations, FSC timber certification, BREEAM and DGNB certification.
Deliverables
- Architectural design for the sports hall
- Structural engineering design
- Building services design (HVAC, sanitary, electrical, fire safety)
- EPB reporting
- Safety coordination for design and execution phases
- Acoustic studies
- Geotechnical investigation and soil testing
- Land surveying
- Optional: fire safety study, accessibility report, rainwater drainage study, demolition monitoring plan, environmental studies, BIM coordination, sports technical equipment design, acoustic simulations, FSC timber certification, BREEAM/DGNB certification
Required services
- Architecture
- Structural engineering
- Building services engineering (HVAC, sanitary, electrical, fire safety)
- EPB reporting
- Safety coordination (design and execution)
- Acoustics consultancy
- Geotechnical engineering
- Land surveying
Pelenoir assessment
The project scope centers on the design of a new municipal sports hall, requiring a multidisciplinary team to deliver architectural design, structural and building services engineering, geotechnical and land surveying, safety coordination, acoustics, and sustainability services. The primary focus is on architectural and engineering design, with secondary support from surveying, specialist consulting, and sustainability disciplines.
-
Architecture 40%
Architectural design for the new municipal sports hall, including conceptual and detailed design, spatial planning, and integration of functional requirements for sports and recreation.
-
Engineering 30%
Structural engineering, building services engineering (HVAC, sanitary, electrical, fire safety), EPB reporting, and geotechnical investigations to support the design and construction of the sports hall.
-
Surveying 10%
Land surveying and geotechnical investigations, including soil testing, groundwater analysis, and lab-based advice for structural engineering.
-
Safety coordination for both design and execution phases, acoustics consultancy, and optional studies such as fire safety, accessibility, environmental studies, and sustainability certifications (BREEAM/DGNB).
-
Sustainability 10%
EPB reporting, sustainability certifications (e.g., BREEAM, DGNB), FSC timber certification, and energy performance optimization for the sports hall.
How to take part
Who can apply
- Minimum two comparable projects in the past five years, demonstrating similarity in project type, budget, complexity, scale, architectural quality and completion status
- Technical competence in relevant regulations, sustainability, EPB and circular construction; proficiency in tools such as BIM and digital coordination
- Qualified and available key personnel with clear roles; CVs of team members and proof of collaboration with other consultancies (e.g., building services, structural engineering, safety coordination)
- Compliance with exclusion grounds under Articles 67–69 of the Belgian Public Procurement Act (2016); submission of a European Single Procurement Document (ESPD)
What to submit
- ESPD (European Single Procurement Document) in Dutch
- Guarantee of 5% of the original contract amount (excl. VAT), rounded up to the nearest ten euros
- Submission via electronic means (e-submission required)
Award criteria
- Price (40%): evaluated using the rule of three (score = (lowest price / offer price) * 40)
- Approach plan and vision (40%)
- Planning and project duration (20%)
Tender documents
The visible files include an ESPD request form in Dutch (ESPD_request_NL.pdf) and its system-generated version (espd-request-d1c6ca65-95fd-4341-81f1-b15eed877fc7-nl.pdf). These documents likely contain the European Single Procurement Document template, instructions for completion, and the required declaration forms for exclusion grounds, selection criteria and self-certification. No detailed design brief, plans, drawings or technical specifications are visible in the supplied context. The exact content of the files beyond the ESPD form remains unknown without further access.
Source
Published on Belgian e-Procurement. Original title: Aanstellen multidisciplinair ontwerpteam en veiligheidscoördinator voor de nieuwe sporthal op de Kouterslag.
Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 26 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
