About the project

Appointment of a designer to develop plans for the demolition of the existing swimming pool at Leopold III-laan 18 in Ypres.

Scope of work

Design services for the demolition of the existing swimming pool, including preparation of demolition plans and compliance with public procurement regulations.

Deliverables

  • Demolition design plans

Required services

  • Demolition design
  • Compliance with public procurement regulations

Pelenoir assessment

This project focuses on the design and planning of the demolition of an existing public swimming pool. The primary scope involves architectural and design services for demolition, with secondary technical engineering support to address structural and safety requirements.

  • Development of demolition design plans, including conceptual and technical preparation for the safe and compliant dismantling of the existing swimming pool structure.

  • Technical engineering aspects of the demolition, such as structural assessments, load calculations, and compliance with safety and regulatory standards.

How to take part

Who can apply

  • Contractors must not be in a state of exclusion as defined by Articles 67 to 69 of the Belgian Public Procurement Law of 17 June 2016
  • Contractors must provide attestations for social security contributions, VAT status, legal situation, fiscal debts, and (if applicable) contractor recognition from the FOD Economy

What to submit

  • Submission via electronic means (eSubmission)
  • Required documents listed in the tender notice

Award criteria

  • Price (100% weight)

Source

Published on Belgian e-Procurement. Original title: Aanstellen van een ontwerper voor het slopen van het oude zwembad.

Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.