About the project

Development of multi-discipline design and cost documentation for the construction of a new police station building, including obtaining a building permit.

Scope of work

Preparation of multi-discipline design and cost documentation for a new police station building, including architectural, structural, road, and installation designs (thermal, ventilation, gas, water, sewage, electrical, and electroenergetic systems), and obtaining a building permit.

Deliverables

  • multi-discipline design documentation
  • cost documentation
  • building permit decision

Required services

  • architectural design
  • structural design
  • road design
  • installation design (thermal, ventilation, gas, water, sewage)
  • electrical and electroenergetic installation design

Pelenoir assessment

The project primarily involves the development of multi-discipline design and cost documentation for a new police station, with a strong focus on architectural design and engineering (structural, road, and installation systems). Project management activities, such as obtaining the building permit and cost documentation, are also required but represent a smaller share of the scope.

  • Structural, road, and installation engineering (thermal, ventilation, gas, water, sewage, electrical, and electroenergetic systems) for the police station, including technical coordination and compliance with building regulations.

  • Architectural concept and building design for the new police station, including spatial planning, functional layout, and aesthetic integration with the public administration building typology.

  • Coordination of the design process, cost documentation, and obtaining the building permit, including liaison with the client and regulatory authorities.

How to take part

Who can apply

  • execution of at least three similar design documentations for public utility buildings with a minimum volume of 1,000 m³ in the last three years
  • possession of qualified personnel with unlimited design licenses in architectural, structural, road, thermal/ventilation/gas/water/sewage, and electrical/electroenergetic specialties
  • registration with the relevant professional chamber (with valid confirmation)

What to submit

  • offer in Polish
  • list of executed services (Załącznik nr 7 do SWZ)
  • list of personnel with qualifications and experience (Załącznik nr 8 do SWZ)
  • power of attorney (if applicable)
  • declaration of non-exclusion under art. 125 ust. 1 of the Public Procurement Law
  • bid bond of 3,000 PLN

Award criteria

  • Price (60%)
  • Professional experience of the contractor (40%)

Source

Published on e-Zamowienia. Original title: Posterunek Policji w Piekoszowie - budowa nowej siedziby. Opracowanie dokumentacji projektowo-kosztorysowej.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 29 Oct 2026.