About the project

Construction of a new double gymnasium with daycare and music facilities to replace the existing 1964 multi-purpose building. The project integrates with existing school buildings and aims to create a durable, flexible, and ecologically sound community space with high architectural and urban design quality.

Scope of work

Design and construction of a new double gymnasium with integrated daycare and music facilities, including urban design, landscape integration, and operational flexibility. The project requires a two-stage competition: Stage 1 focuses on anonymous submission of conceptual design, urban strategy, and feasibility; Stage 2 involves dialog-based refinement, cost calculation, and binding offer from pre-qualified teams.

Deliverables

  • Conceptual design and urban strategy (Stage 1)
  • Refined design and binding construction offer (Stage 2)
  • Construction of a double gymnasium
  • Daycare and music facilities
  • Landscape and outdoor spaces integrated with existing school buildings

Required services

Pelenoir assessment

This project primarily involves the architectural design of a new multi-purpose school hall and daycare facility, with significant scope for urban design, landscape architecture, structural engineering, and construction management. The competition structure and deliverables emphasize integrated design and construction, requiring a multidisciplinary approach to achieve high architectural, ecological, and operational quality.

  • Conceptual and detailed architectural design of the new double gymnasium, daycare, and music facilities, including spatial organization, material selection, and integration with existing school buildings.

  • Urban strategy and integration of the new building with the existing school campus and surrounding public realm, ensuring functional and aesthetic coherence.

  • Design of outdoor spaces, landscape integration, and planting to complement the new building and enhance the school environment.

  • Structural engineering, building services, and technical planning to ensure the durability, flexibility, and ecological performance of the new facility.

  • Construction management, cost calculation, and supervision to ensure the project is delivered on time, within budget, and during ongoing school operations.

How to take part

Who can apply

  • Pre-qualification required with formal submission of participation documents (EUPQ 01–04)
  • Teams must demonstrate experience with similar gymnasium or school projects
  • Project consortia allowed except in disciplines: urban design, landscape, architecture, structural engineering
  • Subcontractors permitted with disclosure requirements
  • Compliance with GPA and IVöB regulations

What to submit

  • Completed pre-qualification forms (EUPQ 01–04) in paper and PDF
  • Organizational chart of the bidding team (A3 landscape)
  • Reference projects documentation (A3 landscape, 2 completed gymnasiums preferred)
  • Approach statement: "Zugang zur Aufgabe" (max. 2 A3 landscape)
  • Physical submission in paper form by post, received by 13:00 on 16 October 2026

Award criteria

  • Urban design precision and architectural quality
  • Operational functionality and flexibility
  • Ecological quality and economic feasibility
  • Feasibility of construction during ongoing school operations
  • Adaptability for future changes

Source

Published on SIMAP Swiss procurement platform. Original title: Gesamtleistungswettbewerb Turnhalle mit Tagesstruktur - Buchs ZH.

Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 2 Sep 2026.