Architecture · Design and build
New Hospital of Montceau-les-Mines
A hospital’s daily use starts with its performance-based brief.
- Deadline
- 18 days left to apply
- Location
- Montceau-les-Mines, Bourgogne-Franche-Comté, France
- Declared value
- EUR 42.5 m
About the project
Rehabilitation and extension of the existing hospital, including construction, exterior development, and integrated performance-based design, operation, and maintenance for functional sectors such as imaging, emergency care, ambulatory services, palliative care, medical-technical services, logistics, and staff facilities.
Why it matters
Montceau-les-Mines hospital’s performance-based brief integrates operation and maintenance into the design. Delivery teams turn daily care into a contractual promise.
Scope of work
Design, construction, exterior development, and operation-maintenance of a new hospital through a performance-based contract. The project includes rehabilitation and extension of the existing hospital, covering functional sectors such as imaging, emergency care, ambulatory services, palliative care, medical-technical services, logistics, and staff facilities.
Deliverables
- rehabilitated and extended hospital building
- exterior developments
- operational and maintenance services
Required services
- architectural design
- engineering
- construction
- operation and maintenance
Pelenoir assessment
The project is a design-build contract for the rehabilitation and extension of a hospital, integrating architectural design, engineering, construction, and performance-based operation-maintenance. The primary AEC business groups supported by the scope are ARCHITECTURE_AND_DESIGN and ENGINEERING_AND_TECHNICAL_PLANNING, with additional involvement from CONSTRUCTION_AND_GENERAL_CONTRACTING and PROJECT_AND_CONSTRUCTION_MANAGEMENT to deliver the full project lifecycle.
-
Architecture 40%
Architectural design of the new hospital, including rehabilitation and extension of the existing building, spatial organization of functional sectors (e.g., imaging, emergency care, ambulatory services, palliative care, medical-technical services, logistics, and staff facilities), and integration of performance-based design requirements.
-
Engineering 30%
Structural, civil, and building-services engineering for the hospital's rehabilitation and extension, including technical planning for medical-technical services, logistics, and infrastructure to support functional sectors.
-
Physical construction, installation, and general contracting for the rehabilitation and extension of the hospital, including exterior developments and integration of all technical and architectural elements.
-
Project management, client representation, and construction supervision to ensure coordination between design, engineering, construction, and performance-based operation-maintenance requirements.
How to take part
Who can apply
- qualified tenderers for competitive dialogue procedure
- exclusion grounds apply (epo-procurement-document)
- no reserved procurement
What to submit
- electronic submission required
- non-restricted documents (26S0082)
Source
Published on BOAMP. Original title: Marché Global de Performance intégrant la conception, la construction, les aménagements extérieurs et l'exploitation-maintenance du Nouvel Hôpital de Montceau-le-Mines.
Summary and assessment prepared by Pelenoir from the public notice (9 Nov 2026). The original notice and its documents are binding. Page updated 8 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

