Architecture · Design contest
New fire stations in Hainaut-Centre
Design and engineering services for the construction of two new fire stations, including architectural design, structural engineering, special technical systems, site development, safety coordination, energy performance (PEB) study, and PEB certification.
- Deadline
- Closed 33 days ago
- Location
- Hainaut, Belgium
About the project
Design and engineering services for the construction of two new fire stations, including architectural design, structural engineering, special technical systems, site development, safety coordination, energy performance (PEB) study, and PEB certification.
Scope of work
Design and engineering services for two new fire stations, including architectural design, structural engineering, special technical systems, site development, safety coordination, energy performance study, and PEB certification. The project requires BIM implementation from design to execution.
Deliverables
- Architectural design
- Structural engineering (stabilité)
- Special technical systems design (techniques spéciales)
- Site development (abords)
- Safety coordination
- Energy performance study (étude du PEB)
- PEB certification
Required services
- Architecture
- Structural engineering
- Mechanical, electrical, and plumbing (MEP) engineering
- Safety coordination
- Energy performance certification
Pelenoir assessment
The project primarily involves the architectural design of two new fire stations, supported by structural and technical engineering, energy performance certification, and safety coordination. The scope is multidisciplinary, with architectural design as the dominant discipline, followed by engineering and sustainability requirements.
-
Architecture 40%
Architectural design of two new fire stations, including conceptual and detailed design, functional layout, and compliance with public building standards.
-
Engineering 35%
Structural engineering ('stabilité'), mechanical, electrical, and plumbing (MEP) systems ('techniques spéciales'), and infrastructure integration for the fire stations.
-
Sustainability 15%
Energy performance study ('étude du PEB') and certification for the fire stations, ensuring compliance with Belgian energy efficiency regulations.
-
Safety coordination during the design phase to ensure compliance with construction safety regulations and risk management.
How to take part
Who can apply
- Architect must be registered with the Order of Architects with minimum 7 years of experience or equivalent foreign qualification
- Demonstration of equivalent reference projects in architecture, special technical systems, and structural engineering, completed within the last 3 years
- Reference projects must have been followed in BIM from design to execution
- For architecture: 1 reference project with a construction cost of at least €4,500,000 (excluding fees, VAT, and non-fixed furniture)
- For special technical systems: 1 reference project with a construction cost of at least €1,000,000 (excluding fees and VAT)
- For structural engineering: 1 reference project with a construction cost of at least €500,000 (excluding fees and VAT)
- Declaration of no exclusion grounds as per Articles 67 to 69 of the Belgian Public Procurement Law (DUME)
Award criteria
- Price (30% weight): Calculated using a rule of three (lowest bid / bid amount) * 30
- Vision of the study mission (65% weight): Detailed in the award guide (second phase)
- Quality of the project team (5% weight): Detailed in the award guide (second phase)
Tender documents
No documents are visibly available for this tender. The document package metadata indicates zero observed files, packages, or download links. Based on the tender context, the expected documents would likely include the full competition brief, architectural and engineering specifications, submission forms, and contractual conditions. However, none of these are currently accessible or listed in the source. The absence of visible files means the exact content and scope of the required submissions remain unknown.
Source
Published on Belgian e-Procurement. Original title: Construction de deux casernes de pompiers - Mission d'étude d'architecture, de stabilité, de techniques spéciales, des abords, de coordination de sécurité, d'étude du PEB et de réalisation d'un certificat PEB.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 22 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.