About the project
Appointment of an architect for the design and construction of a changing room complex at football fields in Ledegem, Belgium.
Why it matters
A changing room complex’s interior layout will shape athletes’ daily use. The tender specifies storage and circulation but leaves the details to the architect.
The Ledegem football club’s tender for a changing room complex specifies the need for storage and circulation. But leaves the exact interior layout to the architect’s first site visit.
This silence isn’t an oversight. It’s a recognition that the daily use of the space will be shaped by the team’s decisions, not the brief’s requirements.
Scope of work
Appointment of an architect to design a changing room complex for football fields in Ledegem. The scope includes architectural design services for the construction of the facility.
Deliverables
- architectural design for changing room complex
Required services
- architectural design
- construction planning
Pelenoir assessment
This project is classified under ARCHITECTURE_AND_DESIGN as its scope is explicitly focused on the architectural design of a changing room complex for a football club. The tender specifies the appointment of an architect for building design and construction planning, with no evidence supporting additional AEC disciplines.
-
Architecture 100%
Architectural design of a changing room complex, including conceptual design, building design, and construction planning for the facility.
How to take part
Who can apply
- architects qualified under Belgian public procurement law
- compliance with exclusion and selection criteria as stated in procurement documents
What to submit
- submission via electronic platform (e-submission required)
- electronic signature required for submission
Tender documents
The visible document package contains a single PDF file named 'bestek.pdf'. This file likely includes the tender specifications, contractual conditions, and submission requirements for the architectural design competition. It may also contain preliminary design guidelines, site plans, or technical requirements for the changing room complex. However, the exact contents of the PDF cannot be confirmed without accessing the file, and no detailed drawings or models are explicitly visible in the tender context.
Source
Published on Belgian e-Procurement. Original title: Aanstellen ontwerper kleedkamercomplex.
Summary and assessment prepared by Pelenoir from the public notice (27 Oct 2026). The original notice and its documents are binding. Page updated 27 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



