Engineering · Service contract
New fire station structural engineering: design and approval planning
Structural engineering design services for a new fire station at the Bundeswehr GefÜbZH Altmark - Kaserne Letzlingen, covering HOAI phases 3 (design planning) and 4 (approval planning).
- Deadline
- 51 days left to apply
- Location
- Sachsen-Anhalt, Germany
About the project
Structural engineering design services for a new fire station at the Bundeswehr GefÜbZH Altmark - Kaserne Letzlingen, covering HOAI phases 3 (design planning) and 4 (approval planning).
Scope of work
Structural engineering design services for a new fire station, covering HOAI phases 3 (design planning) and 4 (approval planning).
Deliverables
- Structural design plans (HOAI phase 3)
- Approval planning documents (HOAI phase 4)
Required services
- Structural engineering design
Pelenoir assessment
The project scope is exclusively focused on structural engineering design services for a new fire station, covering HOAI phases 3 (design planning) and 4 (approval planning). No other AEC disciplines are supported by the extracted facts.
-
Engineering 100%
Structural engineering design for the new fire station, including load-bearing calculations, material specifications, and technical drawings for design and approval planning (HOAI phases 3-4).
Source
Published on eVergabe Online. Original title: Baumaßnahme der Bundeswehr, GefÜbZH Altmark – Kaserne Letzlingen, GNUE "Neubau Feuerwache Altmark - Hauptwache" – Planungsleistungen Tragwerksplanung nach § 51 HOAI – Leistungsphase 3-4 HOAI (§ 51 HOAI).
Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 27 Nov 2026.