About the project

Structural engineering design services for a new fire station at the Bundeswehr GefÜbZH Altmark - Kaserne Letzlingen, covering HOAI phases 3 (design planning) and 4 (approval planning).

Scope of work

Structural engineering design services for a new fire station, covering HOAI phases 3 (design planning) and 4 (approval planning).

Deliverables

  • Structural design plans (HOAI phase 3)
  • Approval planning documents (HOAI phase 4)

Required services

  • Structural engineering design

Pelenoir assessment

The project scope is exclusively focused on structural engineering design services for a new fire station, covering HOAI phases 3 (design planning) and 4 (approval planning). No other AEC disciplines are supported by the extracted facts.

  • Structural engineering design for the new fire station, including load-bearing calculations, material specifications, and technical drawings for design and approval planning (HOAI phases 3-4).

Source

Published on eVergabe Online. Original title: Baumaßnahme der Bundeswehr, GefÜbZH Altmark – Kaserne Letzlingen, GNUE "Neubau Feuerwache Altmark - Hauptwache" – Planungsleistungen Tragwerksplanung nach § 51 HOAI – Leistungsphase 3-4 HOAI (§ 51 HOAI).

Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 27 Nov 2026.