About the project

Comprehensive general planning services for the enhancement of Neufeld an der Leitha railway station, including track and civil engineering, electrical systems, lighting, structural and environmental planning, coordination, permitting support, construction supervision, and commissioning assistance.

Scope of work

General planning services for the enhancement of Neufeld an der Leitha railway station, covering track and civil engineering, electrical systems (25 kV), signaling and control technology, lighting, structural and environmental planning, coordination, permitting support (including UVP environmental impact assessment), construction supervision, and commissioning assistance.

Deliverables

  • detailed and execution planning
  • technical tender documents for construction works
  • coordination of general planning services
  • support for permitting procedures
  • local construction supervision
  • construction management coordination (BauKG)
  • technical support through commissioning and operational approval

Required services

  • track and civil engineering planning
  • overhead line (25 kV) planning
  • signaling and control technology planning
  • 50 Hz electrical engineering planning
  • lighting planning
  • structural engineering planning
  • road and drainage planning
  • environmental planning
  • general planning coordination
  • permitting support (UVP environmental impact assessment)
  • local construction supervision
  • construction management coordination (BauKG)
  • technical support through commissioning and operational approval

Pelenoir assessment

The project focuses on the enhancement of a railway station, with a primary emphasis on engineering and technical planning for track, civil, electrical, and structural systems. Secondary disciplines include project and construction management for coordination, supervision, and permitting, as well as sustainability and building performance for environmental planning and impact assessment.

  • Track and civil engineering planning, overhead line (25 kV) planning, signaling and control technology planning, 50 Hz electrical engineering planning, lighting planning, structural engineering planning, road and drainage planning, and technical support through commissioning and operational approval.

  • General planning coordination, permitting support (including UVP environmental impact assessment), local construction supervision, and construction management coordination (BauKG).

  • Environmental planning and support for the UVP environmental impact assessment process.

How to take part

Who can apply

  • suitability for small and medium-sized enterprises (KMU)
  • selection criteria and evidence as specified in tender documents and European Single Procurement Document (EEE)

What to submit

  • participation applications in German
  • electronic submission required

Award criteria

  • planning concept (45% weight)
  • key personnel (5% weight)
  • total offer price (50% weight)

Source

Published on Austrian Public Procurement Search. Original title: Generalplanerleistungen für die Attraktivierung des Bahnhofs Neufeld an der Leitha NEU.

Summary and assessment prepared by Pelenoir from the public notice (19 Oct 2026). The original notice and its documents are binding. Page updated 16 Oct 2026.