About the project

Development of complete, coordinated multidisciplinary design documentation, including building, technical, and execution designs for a multifunctional public building with underground shelters (U1) for at least 500 people. The project includes architectural, structural, and installation solutions for the shelter, parking, and public spaces such as cultural, educational, and emergency services facilities.

Scope of work

Development of multidisciplinary design documentation for a multifunctional public building with underground shelters (U1) for at least 500 people, including architectural, structural, mechanical, electrical, and plumbing designs. The shelter must comply with civil protection, fire safety, and technical regulations. The documentation will be used for a subsequent construction tender.

Deliverables

  • Building design documentation
  • Technical design documentation
  • Execution design documentation
  • Coordination of multidisciplinary designs
  • Designs for underground shelter (U1) for at least 500 people
  • Architectural and functional solutions for cultural, educational, and emergency services spaces
  • Structural and installation designs for the shelter and building
  • Evacuation and communication solutions for the shelter
  • Required calculations, analyses, opinions, and approvals

Required services

  • Architectural design
  • Structural engineering
  • Mechanical and electrical engineering
  • Civil protection and shelter design
  • Coordination of multidisciplinary designs

Pelenoir assessment

The project primarily involves the development of multidisciplinary design documentation for a multifunctional public building with underground shelters. The scope is dominated by architectural design and engineering, with additional focus on urban integration and regulatory compliance for building performance and safety.

  • Architectural concept, building design, and functional solutions for the multifunctional public building, including cultural, educational, and emergency services spaces. Development of coordinated design documentation for the entire project.

  • Structural, mechanical, electrical, and plumbing engineering for the building and underground shelter (U1), including civil protection, fire safety, and technical compliance for the shelter and evacuation systems.

  • Integration of the building with surrounding public spaces, parking, and urban context, including spatial planning for accessibility and circulation.

  • Compliance with civil protection, fire safety, and technical regulations, including energy efficiency and building performance considerations for the shelter and public spaces.

How to take part

Who can apply

  • The lead architect must hold unrestricted architectural design qualifications under Polish law or equivalent.
  • The lead architect must have experience in designing public buildings with a usable area of at least 300 m².

What to submit

  • Completed offer form (Załącznik nr 1)
  • Statement on exclusion and fulfillment of conditions (Załącznik nr 2)
  • List of key personnel (Załącznik nr 5)
  • Information on subcontractors (Załącznik nr 3)
  • Capital group statement (Załącznik nr 6)
  • Commitment of the entity (Załącznik nr 7)
  • Electronic submission via the e-Zamówienia platform

Award criteria

  • Price (60% weight)
  • Experience of the designated architect beyond the required minimum (40% weight)

Tender documents

The visible document package includes tender specifications (SWZ) in PDF format, submission forms and templates in DOCX format (e.g., offer forms, statements on exclusion, personnel lists, subcontractor information), and a ZIP archive labeled 'Załącznik nr 9 - OPZ z załącznikami.' The ZIP file likely contains detailed project descriptions, technical requirements, and conceptual designs for the multifunctional building and shelter. The PDFs appear to include procedural notices and signed versions of the tender documents. The package does not explicitly show detailed drawings or technical plans, but the ZIP file may contain such materials. The exact contents of the ZIP file remain uncertain without further access.

Source

Published on e-Zamowienia. Original title: Opracowanie wielobranżowej dokumentacji projektowej dla przedsięwzięcia polegającego na budowie obiektu wielofunkcyjnego wraz z miejscami ukrycia w Mircu.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 25 Sep 2026.