Engineering · Service contract
Mourillon Darse Cerdan Redevelopment
Redevelopment of the Cerdan dock in Mourillon, Toulon, including stabilization of the east quay, refurbishment of north-west quays, installation of a boat launch ramp, and a davit on the north-west quay.
- Deadline
- Closed 25 days ago
- Location
- Toulon, Provence-Alpes-Côte d'Azur, France
About the project
Redevelopment of the Cerdan dock in Mourillon, Toulon, including stabilization of the east quay, refurbishment of north-west quays, installation of a boat launch ramp, and a davit on the north-west quay.
Scope of work
Private project management (maîtrise d’œuvre privée) for the redevelopment of the Cerdan dock, including basic project management phases from preliminary studies (AVP) to assistance during reception and warranty period (AOR). The project is divided into six technical parts: preliminary studies, project studies, assistance for works contracts, compliance review of execution studies, works execution management, and assistance during reception and warranty period.
Deliverables
- preliminary studies (AVP)
- project studies (PRO)
- assistance for works contracts (ACT)
- compliance review of execution studies (VISA)
- works execution management (DET and OPC)
- assistance during reception and warranty period (AOR)
Required services
- project management (maîtrise d’œuvre)
- engineering studies
- works contract assistance
- compliance review
- works execution management
Pelenoir assessment
The Mourillon Darse Cerdan Redevelopment project primarily involves engineering and technical planning for port infrastructure, including quay stabilization and marine engineering works. It also requires comprehensive project and construction management services for the full project lifecycle, from preliminary studies to warranty period assistance.
-
Engineering 70%
Structural and marine engineering for the stabilization of the east quay, refurbishment of north-west quays, installation of a boat launch ramp, and davit on the north-west quay. Technical planning for port infrastructure redevelopment.
-
Private project management (maîtrise d’œuvre privée) covering all phases from preliminary studies (AVP) to assistance during reception and warranty period (AOR), including works contract assistance, compliance review, and execution management.
How to take part
Who can apply
- refer to the consultation regulations (Règlement de consultation - phase candidatures)
- minimum 5 candidates to be shortlisted
What to submit
- refer to the consultation regulations (Règlement de consultation - phase candidatures)
Award criteria
- Price: 40%
- Technical value: 50%
- Environmental criteria: 10%
Source
Published on BOAMP. Original title: TLN - MOURILLON - Réaménagement de la darse Cerdan - marché de maîtrise d’œuvre privée.
Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 26 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


