About the project

Upgrade of the existing A12 Inntal motorway junction Wiesing to a roundabout south of the motorway, including construction of a new Inn river bridge and bypass of ramp 4 onto the motorway. The contract covers accompanying construction supervision and client representation services.

Scope of work

Accompanying construction supervision and client representation for the upgrade of the A12 Inntal motorway junction Wiesing to a roundabout and construction of a new Inn river bridge with bypass ramp. Services include oversight of construction works, compliance checks, and client advocacy throughout the project duration.

Deliverables

  • construction supervision services
  • client representation services
  • compliance documentation
  • progress reports

Required services

  • construction supervision
  • client representation
  • quality assurance
  • contract management

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as its scope is exclusively focused on construction supervision and client representation services for a motorway junction upgrade and new river bridge. No architectural, engineering, or other AEC design disciplines are supported by the extracted facts.

  • Accompanying construction supervision, client representation, quality assurance, contract management, and compliance oversight for the motorway junction upgrade and new river bridge construction.

How to take part

Who can apply

  • submission of reference projects for the project leader and deputy
  • documented professional experience and qualifications for project leader and deputy
  • compliance with gender parity requirements
  • consortia limited to maximum 2 members

What to submit

  • completed submission forms (D.1-D.6 including offer cover sheet)
  • reference projects for project leader and deputy
  • documentation of professional experience and qualifications
  • declaration of compliance with gender parity
  • electronic submission via www.provia.at

Award criteria

  • offered total net price (weight: price)
  • offered quality (weight: quality)

Tender documents

The visible files include two PDFs labeled as corrections to the tender documents, likely containing updates or clarifications to the original procurement terms. Another PDF, 'Beilage 2_Kostenteilungsplan,' probably outlines the cost-sharing or budget allocation plan for the project. The ZIP file 'Beilage 1_Einreichprojekt Wiesing' likely contains detailed project plans, drawings, or design documents related to the motorway junction upgrade and new bridge. The second ZIP file, 'D.1-D.6_inkl. Angebotsdeckblatt_5831_F00,' appears to include submission forms and templates required for the offer, such as the cover sheet and structured response sections. The exact contents of the ZIP files remain uncertain without access, but their names suggest a focus on technical and administrative submission materials.

Source

Published on Austrian Public Procurement Search. Original title: A12 Umbau ASt Wiesing + Neubau Innbrücke - Begleitende Bauüberwachung und Bauherrenvertretung.

Summary and assessment prepared by Pelenoir from the public notice (27 Nov 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.