Project and construction management · Service contract
Motorway bridge and motorway junction rebuild: site supervision for major upgrade
Local construction supervision (Örtliche Bauaufsicht, ÖBA) for the rebuild of the Sill bridge and Innsbruck Mitte motorway junction on the A12 Inntal motorway.
- Deadline
- 16 days left to apply
- Location
- Innsbruck, Tyrol, Austria
About the project
Local construction supervision (Örtliche Bauaufsicht, ÖBA) for the rebuild of the Sill bridge and Innsbruck Mitte motorway junction on the A12 Inntal motorway.
Scope of work
Local construction supervision (ÖBA) for the rebuild of the Sill bridge and Innsbruck Mitte motorway junction, including quality and price evaluation of submitted offers.
Deliverables
- construction supervision services
Required services
- construction supervision (Örtliche Bauaufsicht, ÖBA)
Pelenoir assessment
This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT due to its focus on local construction supervision (ÖBA) for a major transport infrastructure upgrade. The scope is limited to oversight, compliance monitoring, and coordination of construction activities, with no evidence of architectural design, engineering, or other AEC disciplines in the procurement requirements.
-
Local construction supervision (Örtliche Bauaufsicht, ÖBA) for the rebuild of the Sill bridge and Innsbruck Mitte motorway junction, including quality and price evaluation of submitted offers, compliance monitoring, and coordination of construction activities.
How to take part
Who can apply
- bidders may form consortia of up to two members
What to submit
- offers must be submitted electronically via www.provia.at
- offers must be valid for 5 months
- submission language: German
Award criteria
- price: evaluated net total price as per tender documents
- quality: evaluated quality as per tender documents
- bridge specialist team leader: weighted points
- road specialist team leader: weighted points
- staff certification in concrete technology: weighted points
- experience and qualifications of ÖBA leader and technicians: weighted points
Tender documents
The visible ZIP files are named as annexes and base-round documents for the tender. D.2 - Beilagen_Teil-01_BR.zip, D.2 - Beilagen_Teil-02_BR.zip and D.2 - Beilagen_Teil-03_BR.zip likely contain detailed annexes such as technical specifications, drawings, or contractual conditions for the bridge and road rebuild. D.1-D.6_Basisrunde.zip probably includes core tender documents such as submission forms, general conditions, and instructions for bidders. The exact content of each ZIP cannot be confirmed without access, but the naming suggests a structured division between core tender documents and specific annexes.
Source
Published on Austrian Public Procurement Search. Original title: A12 Inntal Autobahn / INSB+EGSA IBK Amras – Sillbrücke und Umbau AST Innsbruck Mitte - Örtliche Bauaufsicht (ÖBA).
Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.