About the project

Coordination of spatial and environmental aspects for the full expansion of the A5 Nord/Weinviertel motorway between Poysbrunn and the national border during preliminary and final design phases (EP and BP). The contract includes an option for extended services.

Scope of work

Coordination of spatial and environmental planning for the full expansion of the A5 Nord/Weinviertel motorway between Poysbrunn and the national border. Services include environmental and spatial coordination during preliminary (EP) and final design (BP) phases, with an option for extended services.

Deliverables

  • Coordination of spatial and environmental planning
  • Integration of environmental impact assessments
  • Support for preliminary and final design phases

Required services

Pelenoir assessment

This project primarily involves urban design and spatial planning for the expansion of a motorway, with a strong focus on coordinating environmental and spatial aspects. Secondary disciplines include engineering and technical planning for infrastructure design, as well as sustainability and building performance to address environmental compliance and impact assessments.

  • Coordination of spatial planning and integration for the motorway expansion, ensuring alignment with regional development goals, land-use policies, and public-realm considerations.

  • Technical engineering support for the motorway expansion, including infrastructure planning, civil engineering, and integration of environmental assessments into design phases.

  • Integration of environmental impact assessments and sustainability considerations into the motorway expansion planning, ensuring compliance with environmental regulations and performance standards.

How to take part

Who can apply

  • Open to qualified service providers
  • Submission of offers in German
  • Electronic submission required via www.provia.at

What to submit

  • Offers must be submitted electronically
  • Offers must remain valid for 3 months
  • No financial security required

Award criteria

  • Price: evaluated based on the offered net total price
  • Quality: evaluated based on the offered quality

Tender documents

The visible files likely include tender documents such as contract conditions (e.g., 'A5 Nord VA_KRU_D.1.pdf'), environmental planning reports or guidelines (e.g., 'A5NordB_UVP2005_EVZ_EP_2005.pdf'), and technical drawings or plans related to the motorway expansion (e.g., 'A5NordB_UVP2005_Inhaltsverzeichnis_Gutachten.png'). There are also submission forms and templates (e.g., 'A5NordB_VA_KRU_D.5.1.xlsx') for structuring offers. The exact content of individual files cannot be confirmed without access, but the filenames suggest a focus on environmental and spatial coordination requirements.

Source

Published on Austrian Public Procurement Search. Original title: A 5 Nord/Weinviertel Autobahn Vollausbau Poysbrunn bis Staatsgrenze - Koordination Raum und Umwelt EP und BP (Option).

Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.