Engineering · Service contract
Modernization of Wodna Nuta indoor swimming pool and TOROPOL artificial ice rink
Preparation of multi-discipline as-built documentation for the modernization of an indoor swimming pool and an artificial ice rink in Opole.
- Deadline
- Closed 16 days ago
- Location
- Opole, Opolskie, Poland
About the project
Preparation of multi-discipline as-built documentation for the modernization of an indoor swimming pool and an artificial ice rink in Opole.
Scope of work
Preparation of multi-discipline as-built documentation for the modernization of an indoor swimming pool (Wodna Nuta) and an artificial ice rink (TOROPOL) in Opole, covering at least two construction disciplines.
Deliverables
- multi-discipline as-built documentation
- technical documentation
Required services
- architectural services
- engineering services
- measurement services
- coordination of multi-discipline documentation
Pelenoir assessment
The project involves the preparation of multi-discipline as-built documentation for the modernization of an indoor swimming pool and an artificial ice rink. The scope is primarily focused on architectural and engineering documentation, with a secondary emphasis on measurement services to ensure accuracy and compliance with technical standards.
-
Engineering 50%
Preparation of as-built engineering documentation for structural, sanitary, electrical, and telecommunication systems, including technical coordination and compliance with engineering standards.
-
Architecture 40%
Preparation of as-built architectural documentation for the modernization of the indoor swimming pool and artificial ice rink, including building design, spatial arrangements, and compliance with architectural standards.
-
Surveying 10%
Measurement services for the preparation of accurate as-built documentation, including geodetic surveys and inventory measurements of existing structures and systems.
How to take part
Who can apply
- Contractors must demonstrate experience in preparing as-built, inventory, or technical documentation for buildings covering at least two construction disciplines within the last three years.
- Contractors must have personnel with qualifications in structural, sanitary, electrical, and telecommunication disciplines, including a coordinator with OIIB certification.
- Contractors may jointly submit offers but must designate a representative and specify the scope of work for each participant.
What to submit
- Offer prepared in Polish
- Statement confirming no grounds for exclusion (Załącznik nr 4 do SWZ)
- List of completed services (Załącznik nr 5 do SWZ)
- Confirmation of personnel qualifications and OIIB certification (Załącznik nr 8 do SWZ)
- Power of attorney for joint bidders (if applicable)
Award criteria
- Price (60%)
- Completion time (40%)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji powykonawczej wielobranżowej dla zadania inwestycyjnego pn. "Modernizacja krytej pływalni Wodna Nuta oraz modernizacja sztucznego lodowiska TOROPOL w Opolu"..
Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
