About the project

Modernization of an existing outdoor sports complex including replacement of synthetic and grass surfaces on multi-purpose and football pitches, construction of three new modular containers for toilets, changing rooms, storage and a coach room, installation of new sports equipment (goalposts, volleyball poles, basketball hoops), replacement of fencing and outdoor LED lighting, and installation of a video surveillance system. The project follows a design-and-build delivery model requiring the contractor to prepare technical documentation and obtain a building permit.

Scope of work

Design and construction of modernized sports complex including synthetic and grass pitch surfaces, three new modular containers for toilets, changing rooms, storage and coach room, new sports equipment, fencing, LED lighting and video surveillance. Contractor must prepare technical documentation, obtain building permit and all necessary approvals.

Deliverables

  • technical documentation for modernization
  • building permit
  • synthetic multi-purpose pitch surface
  • artificial grass football pitch surface
  • three new modular containers (toilets, changing rooms, storage, coach room)
  • new goalposts, volleyball poles and basketball hoops
  • new fencing
  • new LED outdoor lighting
  • video surveillance system

Required services

Pelenoir assessment

This project primarily involves the modernization of an outdoor sports complex, requiring a combination of architectural design, engineering, and construction services. The scope is dominated by the design and technical planning of pitch surfaces, modular facilities, and infrastructure, with a significant portion of the work dedicated to physical construction and installation.

  • Architectural design of the modernized sports complex, including conceptual and technical documentation for the replacement of pitch surfaces, modular containers for toilets, changing rooms, storage, and coach room, as well as integration of new sports equipment, fencing, and outdoor lighting.

  • Structural and technical engineering for the installation of synthetic and grass pitch surfaces, modular containers, sports equipment, fencing, LED lighting, and video surveillance systems, as well as obtaining the building permit and ensuring compliance with technical standards.

  • Physical construction and installation works, including the replacement of pitch surfaces, construction of modular containers, installation of sports equipment, fencing, LED lighting, and video surveillance systems, as well as site preparation and landscaping.

How to take part

Who can apply

  • Contractor must have completed at least one similar sports facility construction or modernization project worth at least PLN 500,000 in the last 5 years
  • Contractor must personally execute key tasks: synthetic grass surface and polyurethane multi-purpose pitch surface installation
  • Exclusion of contractors linked to entities supporting aggression against Ukraine (art. 7 of the Act on Special Solutions for Counteracting Support for Aggression against Ukraine)

What to submit

  • Offer must be submitted electronically via the Platforma Zakupowa OpenNexus (platformazakupowa.pl)
  • Offer must be signed with a qualified electronic signature, trusted signature or personal signature
  • Offer must be prepared in Polish using provided templates
  • Required documents include: list of completed construction works, power of attorney (if applicable), bid bond, description of equivalent solutions (if proposed)

Award criteria

  • Price (80% weight)
  • Guarantee period (20% weight)

Source

Published on e-Zamowienia. Original title: „Modernizacja kompleksu sportowego ”Moje boisko – Orlik 2012” w Złocieńcu przy ul. F. Chopina” – II postępowanie.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 28 Sep 2026.