About the project

Comprehensive preparation of full design and cost documentation, including technical assessment, modernization of sports fields, fencing, and sanitary facilities, along with author supervision and transfer of copyrights for the existing Moje Boisko-Orlik 2012 sports complex.

Scope of work

Preparation of full design and cost documentation for the modernization of the Moje Boisko-Orlik 2012 sports complex, including technical assessment, modernization of sports fields, fencing, sanitary facilities, and author supervision. The documentation must comply with Polish regulations, accessibility standards, and Ministry of Sport and Tourism guidelines.

Deliverables

  • Full design and cost documentation
  • Technical assessment report including current condition, damage causes, and modernization recommendations
  • Modernization designs for sports fields, fencing with ball catchers, and sanitary facilities
  • Author supervision during implementation
  • Transfer of copyrights

Required services

Pelenoir assessment

This project primarily involves the modernization of a sports complex, requiring comprehensive architectural and engineering design services. The scope includes architectural design for sports fields, fencing, and sanitary facilities, as well as structural, water/sewage, and electrical engineering. Author supervision is also required, adding a secondary project management component. The project is classified under public procurement for design and cost documentation services.

  • Architectural design for the modernization of the sports complex, including conceptual and detailed design of sports fields, fencing, sanitary facilities, and overall site layout to comply with Polish regulations and accessibility standards.

  • Structural, water/sewage, and electrical engineering design for the modernization of the sports complex, including technical assessments, damage analysis, and infrastructure upgrades to meet regulatory and functional requirements.

  • Author supervision during the implementation phase to ensure compliance with the design documentation and regulatory standards.

How to take part

Who can apply

  • Contractors must demonstrate technical capacity through qualified personnel with specific design licenses (architectural, structural, water/sewage, electrical)
  • Local site inspection required before submission
  • Consortium participation allowed with designated representative

What to submit

  • Offers submitted electronically via the e-Zamówienia Platform
  • Documents in Polish language
  • Standardized forms: offer form, statements on exclusion criteria, compliance with participation conditions, and consortium declarations (if applicable)

Award criteria

  • Gross offer price – 60%
  • Deadline for free removal of defects and errors in documentation (number of working days) – 40%

Tender documents

The visible document package includes the main tender specifications (SWZ) in PDF format, likely detailing technical and procedural requirements. There are multiple DOCX files containing standardized forms for offers, declarations of eligibility, and consortium agreements, which bidders must complete and submit. A situational map PDF shows the location of the sports complex. The contract draft PDF outlines proposed contractual terms for the design and cost documentation services. While the filenames indicate the nature of these documents, their exact contents remain unverified as the files were not downloaded or analyzed.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo-kosztorysowej w ramach zadania pn.: „Modernizacja kompleksu sportowego "Moje Boisko-Orlik 2012" przy II Liceum Ogólnokształcącym w Tomaszowie Mazowieckim”..

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 29 Oct 2026.