Engineering · Service contract
Modernization of air conditioning systems in Poznań City Hall
Development of multi-discipline construction and execution design documentation for the modernization of cooling and heating systems in office and session rooms of the Poznań City Hall building, including the use of renewable energy sources and author's…
- Deadline
- Closed 12 days ago
- Location
- Poznań, Wielkopolskie, Poland
About the project
Development of multi-discipline construction and execution design documentation for the modernization of cooling and heating systems in office and session rooms of the Poznań City Hall building, including the use of renewable energy sources and author's supervision.
Scope of work
Development of multi-discipline construction and execution design documentation for the modernization of air conditioning systems in Poznań City Hall, including renewable energy integration and 36-month warranty on the design documentation. Author's supervision is required.
Deliverables
- multi-discipline construction design documentation
- execution design documentation
- author's supervision
Required services
- architectural and engineering design
- HVAC system modernization
- renewable energy integration
- author's supervision
Pelenoir assessment
This project primarily involves the modernization of HVAC systems in a public building, focusing on technical engineering design and planning. The scope also includes sustainability aspects through renewable energy integration and requires author's supervision, indicating a secondary role for project management.
-
Engineering 70%
Design and technical planning for the modernization of HVAC systems, including cooling and heating installations, integration of renewable energy sources, and ensuring compliance with technical and regulatory requirements.
-
Sustainability 20%
Integration of renewable energy sources into the HVAC modernization, ensuring energy efficiency and sustainability performance of the building systems.
-
Author's supervision to ensure the design is implemented according to the specifications and standards during the execution phase.
How to take part
Who can apply
- minimum one completed project of air conditioning system modernization with cooling capacity of at least 200 kW in the last 5 years
- at least one person with unlimited design qualifications in thermal, ventilation, gas, water and sewage installations with 5 years of experience
- at least one person with unlimited design qualifications in electrical and power installations with 5 years of experience
- at least one person with unlimited construction design qualifications with 5 years of experience
What to submit
- offer form (załącznik nr 1 do SWZ)
- description of design work schedule for evaluation (pkt XI.3 SWZ)
- documents confirming eligibility and experience (załącznik nr 6 and 7 to SWZ)
- statement on exclusion and meeting participation conditions (załącznik nr 2a, 2b, 3, 4, 5 to SWZ)
- power of attorney if applicable
Award criteria
- Price (60%)
- Organization of author's supervision (32%)
- Schedule of design work (8%)
Source
Published on e-Zamowienia. Original title: Opracowanie projektu modernizacji systemów klimatyzacji w budynku Urzędu Miasta Poznania na Placu Kolegiackim 17 z uwzględnieniem odnawialnych źródeł energii, wraz z pełnieniem nadzoru autorskiego.
Summary and assessment prepared by Pelenoir from the public notice (26 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
