About the project

Development of complete multi-discipline design documentation required for the modernization of a 200-meter shooting range, including architectural, structural, electrical, mechanical, and ballistic design, as well as accessibility for persons with disabilities.

Scope of work

Development of complete multi-discipline design documentation for the modernization of a 200-meter shooting range, including architectural, structural, electrical, mechanical, ballistic, and acoustic design, with a focus on accessibility for persons with disabilities. The documentation must enable obtaining a building permit.

Deliverables

  • Complete multi-discipline design documentation for modernization of a 200m shooting range (Wariant III, rozbudowana)
  • Architectural design
  • Structural design
  • Electrical and mechanical systems design
  • Ballistic and technological design for the shooting range
  • Acoustic design
  • Documentation enabling issuance of a building permit

Required services

  • Architectural design services
  • Engineering design services
  • Project supervision and documentation management
  • Cost estimation and project preparation
  • Risk control and prevention consulting

Pelenoir assessment

The project primarily involves the modernization of a 200-meter shooting range, requiring a multi-discipline design approach. The scope is dominated by architectural design and engineering (structural, electrical, mechanical, ballistic, and acoustic), with additional specialist consulting for ballistic, acoustic, and risk-related aspects. The focus is on delivering complete design documentation to enable a building permit.

  • Architectural concept and building design for the modernization of the 200-meter shooting range, including spatial organization, accessibility adaptations, and integration of ballistic and acoustic requirements.

  • Structural, electrical, mechanical, ballistic, and acoustic engineering design for the shooting range, including technical systems integration and compliance with safety and accessibility standards.

  • Specialist advisory for ballistic/technological design, acoustic consulting, and risk control/prevention to ensure compliance with shooting range safety and performance standards.

How to take part

Who can apply

  • At least one designer with unlimited architectural design qualifications (team leader)
  • At least one designer with unlimited structural engineering qualifications
  • At least one designer with road engineering qualifications
  • At least one designer with electrical and electroenergetic systems qualifications
  • At least one designer with thermal, ventilation, gas, water, and sewage systems qualifications
  • One person with experience in ballistic/technological design of shooting ranges
  • One acoustic consultant with experience in shooting range acoustics
  • Experience in designing or modernizing shooting ranges with at least one shooting position and bullet trap
  • Design documentation must have received a building permit within the last 10 years

What to submit

  • Offer submitted electronically via the eZamawiający platform
  • Documents in Polish
  • Documents in formats: .pdf, .doc, .docx, .zip, .7z, .PAdES
  • Electronic signature (trusted or personal) required for submissions
  • Submission of a list of designers with their qualifications and experience (Załącznik nr 6 do SWZ)
  • Declaration of non-exclusion and fulfillment of participation conditions (Załącznik nr 3 do SWZ)
  • If relying on third-party resources, a declaration from the third party (Załącznik nr 5 do SWZ)
  • Commitment from third parties to provide resources (Załącznik nr 7 do SWZ)

Award criteria

  • Price (60% weight)
  • Quality guarantee period (40% weight): minimum 3 years required, with higher points for longer guarantees (4 years: 25 points, 5+ years: 40 points)

Source

Published on e-Zamowienia. Original title: „Opracowanie kompletnej wielobranżowej dokumentacji projektowej, niezbędnej do przeprowadzenia modernizacji strzelnicy kulowej Wariant III strzelnica 200m wersja rozbudowana”.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 15 Sep 2026.