Project and construction management · Service contract
Kościelna Street small retention and green infrastructure project
Supervision and contract engineering services for the redevelopment of Kościelna Street in Poznań, including small retention systems, a green park, underground retention tanks, and stormwater management infrastructure.
- Deadline
- Closed 29 days ago
- Location
- Poznań, Wielkopolskie, Poland
About the project
Supervision and contract engineering services for the redevelopment of Kościelna Street in Poznań, including small retention systems, a green park, underground retention tanks, and stormwater management infrastructure. The project aims to enhance flood resilience, improve public green spaces, and integrate blue-green infrastructure for climate adaptation.
Scope of work
The contract covers comprehensive contract engineering services, including construction supervision, project coordination, and technical, financial, and schedule control for the redevelopment of Kościelna Street. The project includes stormwater retention infrastructure (underground tanks, surface retention devices), a public park with green spaces, pathways, and urban furniture, as well as stormwater pre-treatment and irrigation systems.
Deliverables
- Construction supervision for street redevelopment and green infrastructure
- Coordination of the investment process
- Technical, financial, and schedule compliance control
- Preparation of documents for project settlement and final acceptance
Required services
- Contract engineering (Inżynier Kontraktu)
- Construction supervision (Nadzór inwestorski)
- Project documentation review
- Financial and schedule monitoring
- EU funding compliance and reporting
Pelenoir assessment
This project primarily involves project and construction management services for the redevelopment of Kościelna Street, focusing on contract engineering, construction supervision, and coordination of stormwater retention and green infrastructure. Engineering and technical planning is a secondary but essential component, addressing the design and oversight of retention systems and related infrastructure.
-
Contract engineering, construction supervision, project coordination, technical and financial compliance control, and EU funding reporting for the redevelopment of Kościelna Street, including stormwater retention infrastructure and green spaces.
-
Engineering 30%
Technical planning and oversight for stormwater retention systems (underground tanks, surface retention devices), stormwater pre-treatment, irrigation systems, and integration of blue-green infrastructure.
How to take part
Who can apply
- Minimum 2 completed contract engineering or construction supervision projects for street redevelopment, green infrastructure, or stormwater retention systems in the last 5 years
- Personnel with specific qualifications: contract coordinator, road/sanitary/electrical/telecom inspectors, green space inspector, hydrotechnical inspector, settlement specialist, and archaeological supervision coordinator
- Civil liability insurance of at least PLN 250,000 for construction-related activities
What to submit
- Completed offer form (Załącznik nr 3 do SWZ)
- Personnel experience list (Załącznik nr 9 do SWZ)
- Documentation analysis for evaluation (Załącznik nr 10 do SWZ)
- Statement on exclusion criteria and eligibility (Załącznik nr 4 do SWZ)
- Power of attorney (if applicable)
- Subcontractor commitments (if applicable)
Award criteria
- Price (60%)
- Personnel experience (20%)
- Documentation analysis (20%)
Tender documents
The visible document package includes a reference to the 'SWZ / wyjasnienia do SWZ / zmiany do sWZ / inne' (Specification of Essential Terms of Contract and related documents) available on the procedure's webpage. This likely contains the full contract specifications, technical requirements, and templates for submission forms (e.g., offer forms, personnel experience lists, and documentation analysis). The package may also include project drawings and plans for the street redevelopment and green infrastructure, though these are not explicitly named. The exact contents of the files remain uncertain as the documents were not downloaded, and no specific filenames or detailed descriptions of the plans were provided.
Source
Published on e-Zamowienia. Original title: INŻYNIER KONTRAKTU – MAŁA RETENCJA W UL. KOŚCIELNEJ W POZNANIU (skrócona nazwa postępowania).
Summary and assessment prepared by Pelenoir from the public notice (20 Oct 2026). The original notice and its documents are binding. Page updated 19 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.