About the project

Supervision of construction works for the thermal retrofit of a primary school building, including energy efficiency improvements and building systems upgrades.

Scope of work

Supervision of construction works for the thermal retrofit of a primary school building, including coordination of contractors, quality control, and compliance with project documentation. The supervision team must include qualified inspectors for structural, sanitary, and electrical works, each with specified professional credentials and experience.

Deliverables

  • Supervision of construction works
  • Quality control and compliance verification
  • Coordination of contractors and subcontractors
  • Progress reporting

Required services

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it involves investor supervision and construction management services for a thermal retrofit of a primary school building. The scope does not include architectural design, engineering, or other AEC disciplines beyond supervision and oversight.

  • Supervision of construction works for the thermal retrofit of the primary school, including coordination of contractors, quality control, compliance verification, and progress reporting.

How to take part

Who can apply

  • Contractors must demonstrate experience in supervising construction projects of at least 7,000 m³ volume for a minimum of 90 days per project
  • Supervision team must include: one structural/architectural inspector with unlimited building supervision credentials, one sanitary systems inspector with unlimited credentials, and one electrical systems inspector with unlimited credentials
  • All inspectors must have fluent Polish language skills or provide a translator for the duration of the project
  • Consortium members may combine technical capabilities to meet requirements

What to submit

  • Offer submitted electronically via the e-Zamówienia platform
  • Maximum total file size for offer: 250 MB
  • Documents must be in Polish
  • Signed declarations and forms as specified in the tender documentation

Award criteria

  • Price (60% weight)
  • Payment terms (40% weight)

Tender documents

The visible document package includes the tender specifications (SWZ) in PDF format, which likely contains detailed requirements for the supervision services, eligibility criteria, and procedural rules. Submission forms and declarations are provided as DOCX and DOC files, covering eligibility statements, resource commitments, and consortium agreements. The ZIP file named 'postanowienia umowne' probably contains draft contract conditions and contractual clauses. The OPZ (Załącznik nr 10) is expected to outline the technical scope and project-specific requirements for the thermal retrofit supervision. File contents have not been downloaded or verified, so the exact details of drawings, calculations, or additional technical documents remain unknown.

Source

Published on e-Zamowienia. Original title: PEŁNIENIE NADZORU INWESTORSKIEGO NAD WYKONANIEM ROBÓT BUDOWLANYCH W RAMACH ZADANIA INWESTYCYJNEGO PN.: TERMOMODERNIZACJA BUDYNKU SZKOŁY PODSTAWOWEJ NR 2 W ZIĘBICACH.

Summary and assessment prepared by Pelenoir from the public notice (19 Nov 2026). The original notice and its documents are binding. Page updated 18 Nov 2026.