About the project

Framework agreement for LVIA (LVI and air conditioning) design services for the City of Jyväskylä, JAMK University of Applied Sciences, and two health property companies. The agreement covers the years 2027–2028 with options for 2029–2030. Four contractors will be selected.

Scope of work

Design services for LVI (heating, ventilation, and air conditioning) and related technical systems for municipal, educational, and healthcare buildings under a framework agreement. The contract includes a fixed term of two years (2027–2028) with two optional one-year extensions (2029–2030). Four contractors will be selected based on the lowest comparison price.

Deliverables

  • LVIA design plans and documentation
  • Technical system designs for buildings

Required services

  • heating, ventilation, and air conditioning (HVAC) design
  • technical building systems design

Pelenoir assessment

This project is a framework agreement for the design of technical building systems, specifically heating, ventilation, and air conditioning (HVAC) systems, for public infrastructure, educational, and healthcare facilities. The scope is explicitly focused on engineering and technical planning disciplines.

  • Design of heating, ventilation, and air conditioning (HVAC) systems, as well as related technical building systems for municipal, educational, and healthcare facilities.

How to take part

Who can apply

  • Criminal record certificate required for key personnel (CEO, board members, signatories) and the company itself (corporate fine extract)
  • Certificates must not be older than 12 months
  • Submission of certificates must be agreed in writing with the client immediately after the award decision

What to submit

  • Tender submission via electronic platform (Tarjouspalvelu.fi)
  • Required documents in Finnish

Award criteria

  • Lowest comparison price (Halvin vertailuhinta)

Source

Published on HILMA. Original title: LVIA-suunnittelu, puitesopimuskilpailutus 2027-2028 ja optiot vuosille 2029 ja 2030.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 1 Oct 2026.