About the project

Preparation of full multi-discipline design documentation for the construction of two year-round ski jumps (HS20 and HS37) with a shared landing hill, judges' stand, and necessary infrastructure including site development, installations, and lighting. The project includes obtaining all required permits, geological surveys, and a building permit for Stage I of the investment.

Scope of work

Preparation of complete multi-discipline design documentation for two year-round ski jumps (HS20 and HS37) with shared landing hill, judges' stand, and supporting infrastructure. Includes geological surveys, obtaining permits, building permit application, and author's supervision during construction. The design must comply with FIS requirements, ensure accessibility for disabled persons, and allow for future expansion stages.

Deliverables

  • Full multi-discipline design documentation (Stage I)
  • Project for site development
  • Architectural and construction design
  • Technical design
  • Execution designs for all disciplines
  • Bill of quantities and investor's cost estimates
  • Technical specifications for execution and acceptance of construction works (STWiOR)
  • Geological surveys (drillings, geotechnical opinion)
  • Building permit application with all required attachments
  • Author's supervision documentation and updates

Required services

  • Engineering design services
  • Project supervision and documentation
  • Geotechnical surveys
  • Permit and approval acquisition
  • Author's supervision during construction (estimated 15 site visits)

Pelenoir assessment

This project primarily involves the engineering and technical planning of a ski jump complex, including structural and civil design, geotechnical surveys, and infrastructure development. Architectural design and project management services are also required to support the overall delivery of the multi-discipline design documentation.

  • Structural, civil, and technical engineering design for the ski jumps (HS20 and HS37), shared landing hill, judges' stand, and supporting infrastructure, including compliance with FIS requirements and geotechnical surveys.

  • Architectural design of the ski jumps, judges' stand, and site development, ensuring functional and aesthetic integration with the surrounding environment and accessibility for disabled persons.

  • Project management, permit acquisition, building permit application, and author's supervision during construction, including coordination of design disciplines and compliance with regulatory requirements.

How to take part

Who can apply

  • Minimum one successfully completed design documentation for ski jump construction, expansion, or modernization within the last 3 years
  • At least one person with unlimited construction design license in structural-engineering discipline and minimum 2 years of experience, including participation in at least two ski jump design projects
  • All personnel must be fluent in Polish or provide a translator at their own cost
  • Consortium members may combine qualifications

What to submit

  • Offer form (Załącznik nr 1 do SWZ) with lump-sum price
  • Statutory declarations and documents confirming eligibility and absence of exclusion grounds
  • List of completed services (reference projects) for the last 3 years
  • List of personnel with qualifications, licenses, and experience
  • Power of attorney for consortium representatives (if applicable)
  • Electronic submission with qualified, trusted, or personal signature in Polish

Award criteria

  • Price (100% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej dla Etapu I inwestycji – tj. skoczni HS20 i HS37 ze wspólnym zeskokiem, stanowiskiem sędziowskim oraz niezbędną infrastrukturą.

Summary and assessment prepared by Pelenoir from the public notice (12 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.