About the project

Planning services for substructure works required due to the electrification of the Innkreisbahn railway line between Neumarkt-Kallham and Braunau am Inn.

Scope of work

Planning services for substructure works required for the electrification of the Innkreisbahn railway line, including foundation planning, cable duct construction, and related civil engineering tasks.

Deliverables

  • Substructure planning documents
  • Foundation plans
  • Cable duct construction plans
  • Personnel deployment plans

Required services

  • Railway substructure planning
  • Civil engineering design
  • Foundation engineering
  • Electrification infrastructure planning

Pelenoir assessment

This project focuses on the planning of substructure works for the electrification of a railway line, primarily involving engineering and technical planning for civil and foundation engineering tasks. A secondary aspect involves project coordination and management during the planning phase.

  • Structural and civil engineering planning for railway substructure works, including foundation engineering, cable duct construction, and electrification infrastructure planning.

  • Coordination and oversight of the planning phase, including personnel deployment planning and ensuring compliance with project timelines and technical requirements.

How to take part

Who can apply

  • Open to qualified service providers under Austrian public procurement law (BVergG)
  • No reserved participation

What to submit

  • Offers must be submitted in German
  • Electronic submission required via www.provia.at
  • Submission of completed tender forms and supporting documents as specified in the tender package

Award criteria

  • Technically and economically most advantageous offer
  • Quality of the proposed solution

Tender documents

The visible document package includes PDF files likely containing the tender's contractual framework, project description, task specifications, and submission forms for the Innkreisbahn electrification substructure planning. Excel files appear to provide templates for personnel deployment planning, foundation data, and cost calculation. The filenames suggest detailed planning requirements for substructure works, including foundation engineering and cable duct construction. However, the exact content of each file cannot be confirmed without access, and some files may contain supplementary data or standard forms for offer preparation.

Source

Published on Austrian Public Procurement Search. Original title: BAI0.AMV076.01.PPI: Neumarkt-Kallham - Braunau am Inn (a); Streckenelektrifizierung - Elektrifizierung Innkreisbahn; Unterbauplanung für die Restarbeiten aufgr. d. Elektrifizierung.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.